Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
San Francisco Public Utilities Commission (SFPUC)
Rehabilitate existing aging water infrastructure. This includes 24" pipeline rehabilitation, curb ramp construction, and pavement restoration. This project improves reliability of the pipeline that serves the Southeast portion of the University Mound pressure zone, 84,340 SF of Full Depth Planing per 2" Depth of Cut; 1,060 ton of Hot Mix Asphalt (Type A 1/2" Maximum with Medium Grading); 15,400 SF of 8" Thick Concrete Base; 6,000 SF of 8" Thick Concrete Pavement, Parking Strip, or Gutter; 900 SF of 8" Thick Concrete Pavement, Parking Strip, or Gutter. See attached files.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
San Francisco Public Utilities Commission (SFPUC)
Recoat the roof slab.
Posted Date
Nov 13, 2025
Due Date
Dec 11, 2025
Release: Nov 13, 2025
San Francisco Public Utilities Commission (SFPUC)
Close: Dec 11, 2025
Recoat the roof slab.
AvailableCity of Boone
Structural rehabilitation of the existing city of water treatment plant 2 mg ground storage reservoir adjacent to the high service pump building. Project also includes site grading, retaining wall construction, erosion control, and site restoration.
Posted Date
Nov 4, 2025
Due Date
Dec 3, 2025
Release: Nov 4, 2025
City of Boone
Close: Dec 3, 2025
Structural rehabilitation of the existing city of water treatment plant 2 mg ground storage reservoir adjacent to the high service pump building. Project also includes site grading, retaining wall construction, erosion control, and site restoration.
AvailableOpelika City Housing Authority
Work items is included below: approximately 800 lf of 16-inch diameter D.I Water main; approximately 2,400 lf of 12-inch diameter D.I Water main; approximately 860 lf of 8-inch, 6-inch and 4-inch diameter D.I Water main; associated water service installations and transfers; associated water main appurtenances and fittings; associated asphalt paving replacement.
Posted Date
Nov 16, 2025
Due Date
Dec 16, 2025
Release: Nov 16, 2025
Opelika City Housing Authority
Close: Dec 16, 2025
Work items is included below: approximately 800 lf of 16-inch diameter D.I Water main; approximately 2,400 lf of 12-inch diameter D.I Water main; approximately 860 lf of 8-inch, 6-inch and 4-inch diameter D.I Water main; associated water service installations and transfers; associated water main appurtenances and fittings; associated asphalt paving replacement.
AvailableCity of Jackson
Work for this project includes the construction of approx. 1,222 LF of new eight-inch water main at four separate locations for the abandonment of approx. 2,115 LF of twenty-inch transmission main. Work includes 557 Ton HMA, 13A; 327 SF Det F4, modified concrete curb and gutter; 948 SF of concrete sidewalk; 808 SF of 6" concrete curb ramp; traffic control items; 313 SY of performance turf establishment; 594 LF of water main; 383 LF of water main, dir bore; 8 EA water valve and box; 2 EA water main, insertion valve; 271 LF of water service pipe; 5 EA bond restoration; 6 EA water service. See outside link for complete scope of work.
Posted Date
Oct 26, 2025
Due Date
Dec 11, 2025
Release: Oct 26, 2025
City of Jackson
Close: Dec 11, 2025
Work for this project includes the construction of approx. 1,222 LF of new eight-inch water main at four separate locations for the abandonment of approx. 2,115 LF of twenty-inch transmission main. Work includes 557 Ton HMA, 13A; 327 SF Det F4, modified concrete curb and gutter; 948 SF of concrete sidewalk; 808 SF of 6" concrete curb ramp; traffic control items; 313 SY of performance turf establishment; 594 LF of water main; 383 LF of water main, dir bore; 8 EA water valve and box; 2 EA water main, insertion valve; 271 LF of water service pipe; 5 EA bond restoration; 6 EA water service. See outside link for complete scope of work.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis