Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Door & hardware replacements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Purchase 3 each, new 2025 or newer model, 4 door, mid-size truck, 4wd, 5ft bed.
Posted Date
Dec 31, 2025
Due Date
Jan 15, 2026
Release: Dec 31, 2025
Close: Jan 15, 2026
Purchase 3 each, new 2025 or newer model, 4 door, mid-size truck, 4wd, 5ft bed.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove the existing layer of PVC Single Ply membrane and existing layer of 3/8” Fanfold recover board, exposing the original BUR: Granular-Surfaced roof assembly. Overlay of the existing original BUR: Granular-Surfaced roof assembly, via mechanical attachment of a 3/8” Fanfold recover board and mechanical attachment of a 50 MIL PVC single ply membrane. PVC Membrane: Contractor shall furnish and install, via mechanical attachment, a white, 50 mil single-ply membrane roofing system that is fabricated of a weft inserted, low-shrink, anti-wicking polyester fabric and has a thermoplastic coating of PVC material laminated to both sides.
Posted Date
Dec 10, 2025
Due Date
Jan 12, 2026
Release: Dec 10, 2025
Close: Jan 12, 2026
Remove the existing layer of PVC Single Ply membrane and existing layer of 3/8” Fanfold recover board, exposing the original BUR: Granular-Surfaced roof assembly. Overlay of the existing original BUR: Granular-Surfaced roof assembly, via mechanical attachment of a 3/8” Fanfold recover board and mechanical attachment of a 50 MIL PVC single ply membrane. PVC Membrane: Contractor shall furnish and install, via mechanical attachment, a white, 50 mil single-ply membrane roofing system that is fabricated of a weft inserted, low-shrink, anti-wicking polyester fabric and has a thermoplastic coating of PVC material laminated to both sides.
AvailableSchool ceiling replacements.
Posted Date
Jan 8, 2026
Due Date
Jan 20, 2026
Release: Jan 8, 2026
Close: Jan 20, 2026
School ceiling replacements.
AvailableProcurement of Commercial Door and Hardware Vendors.
Posted Date
Dec 25, 2025
Due Date
Jan 23, 2026
Release: Dec 25, 2025
Close: Jan 23, 2026
Procurement of Commercial Door and Hardware Vendors.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →