Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Capital Metropolitan Transportation Authority (CapMetro) issued an IFB for roof replacement at location 2910 that requires removal of the existing PVC single-ply membrane and 3/8" fanfold recover board to expose the original built-up (BUR) granular-surfaced roof, then installation (mechanically attached) of a new 3/8" fanfold recover board and a white 50 mil PVC single-ply membrane. The contract will be awarded to the lowest responsive, responsible bidder whose bid conforms to the solicitation; submission must be via the buyer's eBids system. All eBids must be fully uploaded and submitted prior to 3:00:00 PM Central on the due date.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Capital Metropolitan Transportation Authority (CapMetro) issued an IFB for roof replacement at location 2910 that requires removal of the existing PVC single-ply membrane and 3/8" fanfold recover board to expose the original built-up (BUR) granular-surfaced roof, then installation (mechanically attached) of a new 3/8" fanfold recover board and a white 50 mil PVC single-ply membrane. The contract will be awarded to the lowest responsive, responsible bidder whose bid conforms to the solicitation; submission must be via the buyer's eBids system. All eBids must be fully uploaded and submitted prior to 3:00:00 PM Central on the due date.
Posted Date
Dec 10, 2025
Due Date
Jan 12, 2026
Release: Dec 10, 2025
Close: Jan 12, 2026
Capital Metropolitan Transportation Authority (CapMetro) issued an IFB for roof replacement at location 2910 that requires removal of the existing PVC single-ply membrane and 3/8" fanfold recover board to expose the original built-up (BUR) granular-surfaced roof, then installation (mechanically attached) of a new 3/8" fanfold recover board and a white 50 mil PVC single-ply membrane. The contract will be awarded to the lowest responsive, responsible bidder whose bid conforms to the solicitation; submission must be via the buyer's eBids system. All eBids must be fully uploaded and submitted prior to 3:00:00 PM Central on the due date.
Premium
Access the largest public sector contact database
Release: Dec 10, 2025
Close: Jan 9, 2026
Roof replacements.
AvailableRemove existing epdm roof and insulation down to the original gravel built up roof and remove flashings and metal trim. Installation of a 20 year - 060 mil white tpo membrane roof. Install 1.5" iso insulation cover board and then mechanically attach a 060-mil white tpo membrane roof system. Wall flashings are to go up and over the parapet walls and terminate with a standard metal gravel stop detail. All sheet metal flashing and trim shall be shop fabricated from 24 ga kynar coated flat sheets. Install new gravel stop, drip edge, gutter, downspout, counter flashing, penetration boots, and splice plates. Provide a 20-year ndl warranty. See outside link.
Posted Date
Nov 26, 2025
Due Date
Jan 9, 2026
Release: Nov 26, 2025
Close: Jan 9, 2026
Remove existing epdm roof and insulation down to the original gravel built up roof and remove flashings and metal trim. Installation of a 20 year - 060 mil white tpo membrane roof. Install 1.5" iso insulation cover board and then mechanically attach a 060-mil white tpo membrane roof system. Wall flashings are to go up and over the parapet walls and terminate with a standard metal gravel stop detail. All sheet metal flashing and trim shall be shop fabricated from 24 ga kynar coated flat sheets. Install new gravel stop, drip edge, gutter, downspout, counter flashing, penetration boots, and splice plates. Provide a 20-year ndl warranty. See outside link.
AvailableProcurement of roof replacements for North Springs and Polo Road Recreation Centers.
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
Procurement of roof replacements for North Springs and Polo Road Recreation Centers.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis