Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of roof replacements for North Springs and Polo Road Recreation Centers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes a roof replacement on the diane sayre recreation center. The project involves removing the existing membrane roofing and installing new TPO roofing membrane, and replacing the existing roof translucent panels at the natatorium.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Release: Nov 26, 2025
Close: Jan 8, 2026
The project includes a roof replacement on the diane sayre recreation center. The project involves removing the existing membrane roofing and installing new TPO roofing membrane, and replacing the existing roof translucent panels at the natatorium.
AvailablePremium
Access the largest public sector contact database
Release: Dec 10, 2025
Close: Jan 9, 2026
Roof replacements.
AvailableRemove existing epdm roof and insulation down to the original gravel built up roof and remove flashings and metal trim. Installation of a 20 year - 060 mil white tpo membrane roof. Install 1.5" iso insulation cover board and then mechanically attach a 060-mil white tpo membrane roof system. Wall flashings are to go up and over the parapet walls and terminate with a standard metal gravel stop detail. All sheet metal flashing and trim shall be shop fabricated from 24 ga kynar coated flat sheets. Install new gravel stop, drip edge, gutter, downspout, counter flashing, penetration boots, and splice plates. Provide a 20-year ndl warranty. See outside link.
Posted Date
Nov 26, 2025
Due Date
Jan 9, 2026
Release: Nov 26, 2025
Close: Jan 9, 2026
Remove existing epdm roof and insulation down to the original gravel built up roof and remove flashings and metal trim. Installation of a 20 year - 060 mil white tpo membrane roof. Install 1.5" iso insulation cover board and then mechanically attach a 060-mil white tpo membrane roof system. Wall flashings are to go up and over the parapet walls and terminate with a standard metal gravel stop detail. All sheet metal flashing and trim shall be shop fabricated from 24 ga kynar coated flat sheets. Install new gravel stop, drip edge, gutter, downspout, counter flashing, penetration boots, and splice plates. Provide a 20-year ndl warranty. See outside link.
AvailableCompetitive sealed proposals for roof replacements/repairs and HVAC upgrades at North Shore Middle School and Cunningham Middle School. Scope includes roof restorations (flute fill ISO, coverboard, 60‑mil felt‑back PVC with decor ribs, gutters/downspouts, modified bitumen cap) with 20‑year NDL warranty and HVAC upgrades at Cunningham (controls upgrade, replace 4 AHUs, replace DX coil & condenser, install 13 VFDs, replace 6 hydronic cooling pumps). A 10% proposal security (bid bond) is required.
Posted Date
Dec 7, 2025
Due Date
Jan 12, 2026
Release: Dec 7, 2025
Close: Jan 12, 2026
Competitive sealed proposals for roof replacements/repairs and HVAC upgrades at North Shore Middle School and Cunningham Middle School. Scope includes roof restorations (flute fill ISO, coverboard, 60‑mil felt‑back PVC with decor ribs, gutters/downspouts, modified bitumen cap) with 20‑year NDL warranty and HVAC upgrades at Cunningham (controls upgrade, replace 4 AHUs, replace DX coil & condenser, install 13 VFDs, replace 6 hydronic cooling pumps). A 10% proposal security (bid bond) is required.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis