North Dakota Department of Transportation
State AgencyND
Posted
-
Oct 9, 2026
Temporary Ramp Connections, Grading, Pcc Pavement, Mill & Overlay, Culverts, Fencing, Guardrail, and Incidentals (Request for Proposal)
Work consist of 207,632 tn of removal of pavement, 2,940 lf of removal of pipe all types and sizes, 6 ea of removal of median drain precast concrete, 57,884 lf of remove existing fence, 2 ea of removal of temporary bypass, 98,614 cy of common excavation, 11,089 lf of silt fence, 11,089 lf of remove silt fence, 8,582 sy of milling pavement surface - 2", 13,927 tn of rap, 500 tn of patching, 628 tn of asphalt cement, 202,926 sy of 9" non-reinf concrete pvmt cl ae-doweled, 2 ea of portable rumble strips. See attached file.