Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of removing the existing structure and constructing of a new single span PPC Deck Beam Bridge, 56-0" bk-bk, 30'-0" o-o, reconstructing roadway and other related work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge replacement with approach roadway and related work.
Posted Date
Jan 1, 2026
Due Date
Jan 13, 2026
Release: Jan 1, 2026
Close: Jan 13, 2026
Bridge replacement with approach roadway and related work.
AvailableWork includes clearing and grubbing, 1,946 SY removal of asphalt pavement, all depths, 2 EA removal of bridge, 670 SY removal of concrete pavement w/ variable depth overlay, 1,210 LF removal of curb & gutter, all types, 312 LF removal of gravity sewer line, all sizes, all types, 1 EA removal of gravity sewer manhole, all sizes, all types, 93 LF removal of guard rail double faced rail including rail & posts, 326 LF removal of guard rail, including rails, posts and terminal ends, 2 EA removal of and replacement of low mast lighting assembly. See attached file.
Posted Date
Oct 6, 2025
Due Date
Jan 27, 2026
Release: Oct 6, 2025
Close: Jan 27, 2026
Work includes clearing and grubbing, 1,946 SY removal of asphalt pavement, all depths, 2 EA removal of bridge, 670 SY removal of concrete pavement w/ variable depth overlay, 1,210 LF removal of curb & gutter, all types, 312 LF removal of gravity sewer line, all sizes, all types, 1 EA removal of gravity sewer manhole, all sizes, all types, 93 LF removal of guard rail double faced rail including rail & posts, 326 LF removal of guard rail, including rails, posts and terminal ends, 2 EA removal of and replacement of low mast lighting assembly. See attached file.
AvailableThe City of Winston-Salem seeks a qualified firm to provide professional consulting services to design the replacement of the Old Greensboro Road Bridge over Brushy Fork Creek. The project is partially reimbursed with Federal-aid funding through NCDOT and includes design of a two-span bridge with two 12-foot vehicle lanes, bicycle lanes, sidewalks, ADA accommodations, greenway accommodation, and associated roadway, utility, permitting, traffic control and public outreach tasks. The anticipated contract time is approximately nine months from Notice to Proceed, with design milestones and a required public engagement meeting at the 30% design stage.
Posted Date
Dec 15, 2025
Due Date
Jan 17, 2026
Release: Dec 15, 2025
Close: Jan 17, 2026
The City of Winston-Salem seeks a qualified firm to provide professional consulting services to design the replacement of the Old Greensboro Road Bridge over Brushy Fork Creek. The project is partially reimbursed with Federal-aid funding through NCDOT and includes design of a two-span bridge with two 12-foot vehicle lanes, bicycle lanes, sidewalks, ADA accommodations, greenway accommodation, and associated roadway, utility, permitting, traffic control and public outreach tasks. The anticipated contract time is approximately nine months from Notice to Proceed, with design milestones and a required public engagement meeting at the 30% design stage.
AvailableWork includes approx. 1 LS clearing and grubbing, 73,418 CY unclassified excavation, 3,400 SY solid sodding, 1,378 SY ditch liner, 68 Thousand Gallon watering, 10 AC insect pest control, 114 AC mowing, 19 AC grassing, 700 TN riprap for erosion control, 1,887 SY fine milling, 3,745 Gal asphalt for tack coat, 4 Mile rumble strips, 1,018 LF saw cut, 208 LF 24" reinforced concrete pipe, 775 LF guardrail, signage, pavement marking, 300 LF precast concrete median barrier.
Posted Date
Dec 23, 2025
Due Date
Jan 27, 2026
Release: Dec 23, 2025
Close: Jan 27, 2026
Work includes approx. 1 LS clearing and grubbing, 73,418 CY unclassified excavation, 3,400 SY solid sodding, 1,378 SY ditch liner, 68 Thousand Gallon watering, 10 AC insect pest control, 114 AC mowing, 19 AC grassing, 700 TN riprap for erosion control, 1,887 SY fine milling, 3,745 Gal asphalt for tack coat, 4 Mile rumble strips, 1,018 LF saw cut, 208 LF 24" reinforced concrete pipe, 775 LF guardrail, signage, pavement marking, 300 LF precast concrete median barrier.