City Of Lawrence
The installation of wastewater equipment, including all process, structural, and electrical work. The equipment consists of two (2) Little John digester units that shall be installed inside the PS#02 wetwell, and one above-grade blower unit, which will be permanently installed on a new concrete slab next to the pump station control building. Power will be supplied from the existing pump station control building.
Release
Sep 30, 2024
Close
Nov 05, 2024