Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Lawrence
The installation of wastewater equipment, including all process, structural, and electrical work. The equipment consists of two (2) Little John digester units that shall be installed inside the PS#02 wetwell, and one above-grade blower unit, which will be permanently installed on a new concrete slab next to the pump station control building. Power will be supplied from the existing pump station control building.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Topeka
Odor Control Improvements. Construction of new Superoxygenation odor control system at Central Park Wastewater PS including new building, process piping, electrical, HVAC, plumbing systems, control systems, pavement removal and replacement and other items of work for an odor control system. Installation of a blower and wetwell mounted digester at Rockfire Wastewater PS including electrical modifications and site work for installation of equipment and all other work required for an operating odor control system.
Posted Date
Oct 30, 2025
Due Date
Nov 20, 2025
Release: Oct 30, 2025
City of Topeka
Close: Nov 20, 2025
Odor Control Improvements. Construction of new Superoxygenation odor control system at Central Park Wastewater PS including new building, process piping, electrical, HVAC, plumbing systems, control systems, pavement removal and replacement and other items of work for an odor control system. Installation of a blower and wetwell mounted digester at Rockfire Wastewater PS including electrical modifications and site work for installation of equipment and all other work required for an operating odor control system.
AvailableCity of Austin
Wastewater improvements includes existing 8-inch, 10-inch and 12-inch wastewater pipe near Cameron Road and Capital Plaza has a very high risk of overflows because it does not have enough capacity for current wastewater flows.
Posted Date
Nov 12, 2025
Due Date
Dec 11, 2025
Release: Nov 12, 2025
City of Austin
Close: Dec 11, 2025
Wastewater improvements includes existing 8-inch, 10-inch and 12-inch wastewater pipe near Cameron Road and Capital Plaza has a very high risk of overflows because it does not have enough capacity for current wastewater flows.
AvailableCity of O'Fallon
Demolition of existing dry scrubber odor control system and installation of a new bioscrubber odor control system as detailed in these Contract Documents.
Posted Date
Oct 28, 2025
Due Date
Dec 3, 2025
Release: Oct 28, 2025
City of O'Fallon
Close: Dec 3, 2025
Demolition of existing dry scrubber odor control system and installation of a new bioscrubber odor control system as detailed in these Contract Documents.
AvailableCity of Sunrise
Work includes sludge holding tanks: demolition of existing drop pipe aeration mixing system; installation of coarse bubble wideband diffusers and associated appurtenances; demolition of two (2) raised, corrugated aluminum covers. Installation of four (4) flat aluminum walk on covers; instrumentation for sludge level and process air flow monitoring; vapor phase odor control system: demolition of the existing biosolids odor control system; installation of a dry media adsorption (activated carbon) odor control system and associated appurtenances for treating foul air from the four (4) existing sludge holding tanks.
Posted Date
Sep 29, 2025
Due Date
Nov 21, 2025
Release: Sep 29, 2025
City of Sunrise
Close: Nov 21, 2025
Work includes sludge holding tanks: demolition of existing drop pipe aeration mixing system; installation of coarse bubble wideband diffusers and associated appurtenances; demolition of two (2) raised, corrugated aluminum covers. Installation of four (4) flat aluminum walk on covers; instrumentation for sludge level and process air flow monitoring; vapor phase odor control system: demolition of the existing biosolids odor control system; installation of a dry media adsorption (activated carbon) odor control system and associated appurtenances for treating foul air from the four (4) existing sludge holding tanks.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis