FederalIL
Posted
Sep 10, 2026
Sep 16, 2026
22 MXS Porta-Fab Offices Hangar 1126(SB) and 1107
Design, deliver, build, and install two (2) four-wall, single-story modular office structures. Unit 1: Hangar 1126 (South Bay) Unit 2: Hangar 1107 Both units shall be installed directly upon the existing level concrete hangar floor slab.