CityFL
Posted
Oct 18, 2026
Dec 3, 2026
NW 39th Ave. Wastewater Force-Main Upgrade (Invitation for Bids)
Wastewater force-main upgrade. Scope of work includes - 1 LS erosion and sediment control; 1,600 LF abandon-in-place, fill and grout, existing 4" FM; 2 EA 4" temp. line stop assembly; 3,500 furnish and install 10" HDPE DR 11 force main and fittings; 450 LF furnish and install 8" C900 PVC force main and fittings; 30 LF furnish and install 4" C900 PVC force main and fittings; see outside link.
