Open RFP2027 Task Order Contract for Street Rehabilitation Package 9 - Reconstruction RFP
Description: Work inlcudes street reconstruction to include excavation, subgrade proofrolling and treatment, installation of hot mix asphaltic base and surface courses, concrete pavement, flexible base course, concrete curbs, sidewalks, curb ramps, driveways, retaining walls, mailbox relocations, topsoil and sodding, pedestrian rail, signage and striping, tree removal and installation, speed humps, seal coat and underseal course, and minor utility adjustments to include adjustment of existing valve boxes, relocating customer shutoff valves, backflow preventers and pressure reducing valves, existing meter and meter box relocation, short and long service relays, fire hydrant relocations, adjusting existing manholes and sanitary sewer cleanouts, and manhole reconstructions.