CityTX
Posted
Oct 30, 2026
Dec 4, 2026
2027 Downtown Street Rehabilitation No. 1 RFP
The City of Mineral Wells, Texas seeks proposals for street rehabilitation services.
Description: Street rehabilitation and preservation, including asphalt milling and paving, pavement repairs, micro surfacing, rejuvenating, crack sealing, ADA improvements, curb and gutter repairs, pavement markings, and tree removal.
City · NC, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
232 days before RFP
The recorded pavement study presented Greenville's 2026 roadway work plan for rehabilitation, crack sealing, rejuvenation, and microsurfacing and reported insufficient current funding to maintain conditions.
This is the city's uh plan that they've already put together for 2026. And with this is broken down into rehab. Crack seal uh alternate rehab and rejuvenator. Rehab being the red, crack seal being the brown. Uh rejuvenator is purple and then alternate locations are in kind of a gold color. microsurfacing is this darker red like this here. So the predicted…
Greenville City Council Workshop
Board meeting · Mar 9, 2026
conditions over five years. The current budget of $2.85 million annually would result in a slow degradation to approximately 63 PCI within five years, while a $5 million annual budget would maintain current conditions, and a $10 million budget would show improvement. Mr. Foster outlined various pavement maintenance technologies, including crack sealing,…
Greenville City Council Agenda
Agenda packet · May 11, 2026
Board meeting
169 days before RFP
City staff presented a proposed FY 2026-2027 budget providing $3.5 million in annual funding for the City's pavement management program, a $400,000 increase.
Tem, under new business. Item number 12, presentation of the City of Greenville. Fiscal year 2026, 2027, proposed budget. I now call forward our chief financial officer, Jacob Joyner, for the presentation. Uh. Good evening. Council members. Good evening. Yeah. The, uh. Fiscal year 2627. Proposed operating budget for the city of Greenville. Um, to give you…
Budget
141 days before RFP
The City Council adopted FY2026-27 Engineering Capital Projects Fund spending that includes $3.5 million for pavement management and $500,000 for sidewalk and pedestrian improvements.
ORDINANCE NO. 26-035 CITY OF GREENVILLE, NORTH CAROLINA 2026-2027 BUDGET ORDINANCE 1 of 10 Docusign Envelope ID: F4FB0EE9-13C9-8A9F-83F0-9ADD14851461 Section III. Schedule A. General Fund (010) Revenues Taxes 49,017,903$ Intergovernmental Revenues 49,304,711 Charges for Services 9,330,073 Licenses, Permits & Fees 517,485 Fines & Forfeitures 335,000…
RFP published
Proposals due (18 days left)
Greenville City Council City Council Meeting
Board meeting · May 11, 2026
re increasing our, um, street improvements. $400,000 to bring that total to $3.5 million annually. And that is goes to our annual street resurfacing and increasing the Ada, uh, sidewalk program and the affordable housing program by $100,000 each. And that
City Of Greenville Board Of Adjustment Meeting
Board meeting · May 28, 2026
City of Greenville, North Carolina FY2026-27 Budget
Budget · Jun 8, 2026
Decision makers connected to this RFP from City of Greenville.
Adjacent opportunities open for bidding right now.
CityTX
Posted
Oct 30, 2026
Dec 4, 2026
The City of Mineral Wells, Texas seeks proposals for street rehabilitation services.
CityTX
Posted
Oct 28, 2026
Dec 15, 2026
Project construction may include but is not limited to: Asphalt milling and overlay, seal coat, base and pavement replacement, cleaning and sealing joints and cracks, curb ramps, concrete curbs, sidewalks, driveways, concrete retaining walls-combination type, speed humps, topsoil, sodding, signage, pavement markings installation, adjusting existing valve boxes, meter boxes and manholes, and any other items required due to the site conditions to accomplish the project scope.
CityTX
Posted
Oct 28, 2026
Dec 11, 2026
Construction may include but is not limited to: Asphalt milling and overlay, seal coat, base and pavement replacement, cleaning and sealing joints and cracks, curb ramps, concrete curbs, sidewalks, driveways, concrete retaining walls combination type, speed humps, topsoil, sodding, signage, pavement markings installation, adjusting existing valve boxes and manholes, and any other items required due to the site conditions to accomplish the project scope.
CityMN
Posted
Oct 23, 2026
Nov 18, 2026
Approx 378 SY Remove and Replace Bituminous Pavement 790 LB Structural Steel 100 CY Grouted Riprap 70 LF Reconstruct Timber Pier Cap 150 LF Timber Railing