School DistrictMS
Posted
Nov 20, 2026
Jan 15, 2027
Request for Proposals E-Rate Category 2 Project DeSoto County School District 2027 Southaven High School Fiber Pulls to include switches, access points and installation RFP #440-SHS-DCS27
The DeSoto County School District is soliciting a contractor to upgrade E-Rate Category 2 structured cabling at Southaven High School, including Cat6A horizontal cabling, single‑mode backbone fiber, equipment room infrastructure, patch panels, racks and related components. The scope includes installation of specified Fortinet switches and access points, cable pulls, terminations, testing, as‑built drawings, labeling, documentation and a 20‑year system warranty, plus required certifications and testing results. Award is contingent upon E‑Rate funding approval for Funding Year 2027 and pricing must be honored through the FY2027 service delivery deadline (normally September 30, 2028).
