CountyGA
Posted
Aug 19, 2026
Sep 25, 2026
2027-39
This Invitation for Bid seeks construction of approximately 0.67 miles of new roadway along Magnolia Road in Tattnall County, including grading, drainage, asphalt paving, driveway connections, and striping. The project includes 10-foot travel lanes, 2-foot shoulders, roadside drainage ditches, a 36-inch cross-drainage structure, fourteen paved driveway connections, approximately 9,586 square yards of graded aggregate base course, and approximately 1,617 tons of asphalt pavement. Bids are due September 25, 2026, at 10:00 AM ET, with a mandatory pre-bid meeting scheduled for September 16, 2026; this is a public procurement rather than a grant program.