California Military Department
State AgencyCA
Jul 14, 2026
Closes
Sep 1, 2026
Main Garrison Wastewater Treatment Plant (WWTP) Phase 2 Upgrades
Modernization of the waste water treatment plant.
Description: St Clair College of Applied Arts and Technology is seeking formal RFP proposals for 2027-010 - Central Plant Upgrades - Phase 1 at its Windsor Campus. The work covers replacement and installation of four boiler pumps, three pre-purchased heat exchangers, a bypass valve, and a domestic water booster pump, together with piping, BAS and electrical integration, testing, commissioning, and restoration. The portal lists publication on 2026/08/19 at 09:17:02 AM EDT and closing on 2026/09/14 at 02:00:00 PM EDT, and identifies it as a Broader Public Sector procurement rather than a grant.
HigherEducation · ON, CA
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
California Military Department
State AgencyCA
Jul 14, 2026
Closes
Sep 1, 2026
Modernization of the waste water treatment plant.
CityMD
Aug 3, 2026
Closes
Sep 14, 2026
Provide phase 2 of upgrades to the sludge pumping station (ras/was) at the wastewater treatment plant.
Matteson Area Public Library District
Special DistrictIL
Aug 9, 2026
Closes
Sep 8, 2027
The Matteson Area Public Library District is seeking sealed bids for the 2027 HVAC Upgrades project. Bids are due by 10:00 a.m. on September 8, 2027, at the Matteson Area Public Library, with public opening and reading immediately afterward. Bid documents will be available electronically beginning August 10, 2027, and a non-mandatory pre-bid meeting is scheduled for August 18, 2027, at the project site.
Higher EducationGA
Aug 6, 2026
Closes
Aug 27, 2026
The Board of Regents of the University System of Georgia is seeking design-build services for Project No. J-472, “Utilities Upgrades Phase 1,” at Dalton State College in Dalton, Georgia. The work includes investigating, designing, and constructing upgrades to underground utilities, including replacement of clay sanitary sewer lines and aging iron water lines, plus required stormwater improvements, while minimizing campus disruption. The estimated budget is $3,000,000–$5,000,000, the contract duration is 12 months, and submissions close August 27, 2026.
Procurement and program contacts connected to St. Clair College.