Reed Creek Bank Stabilization (boardwalk) At Savannah Rapids Pavilion
Work inlcudes 22 EA micro piles; 1 LS pre-cast boardwalk installation (beams,treads, abutments, harware); 285 LF handrail - 42" aluminum w/wire mesh (boardwalk); 10 tn asphalt base 4"thick 25mmsp; 5 TN asphalt topping 2" thick 9. 5mmsp; 5 tn landscape gravel; 1 EA construct maintain and remove construction exit; 200 LF orange barrier fence (as directed by engineer), to incl install, maint and removal; 1,650 LF install maintain and remove temporary silt fence type c; 500 SY temporary grassing(incl mulch,seed,and all other items. See attached file.