CityWA
Posted
Jun 12, 2026
Dec 31, 2026
2026 Vendor List RFP
2026 vendor list. Provide materials, supplies, or equipment not connected to a public works project.
Description: 2026 vendor list. Provide materials, equipment, and supplies related to the transportation and distribution of electricity and water to end users, i.e. primary underground cable, transformers, circuit switchers, power poles, overhead and underground distribution products, overhead transmission products, vehicles, as well as other equipment, materials, and supplies related to the operation of the PUD.
SpecialDistrict · WA, US
Decision makers connected to this RFP from Skamania County Public Utility District 1.
Adjacent opportunities open for bidding right now.
CityWA
Posted
Jun 12, 2026
Dec 31, 2026
2026 vendor list. Provide materials, supplies, or equipment not connected to a public works project.
Spokane County Fire District 3
Fire DepartmentWA
Posted
Jun 12, 2026
Dec 31, 2026
2026 vendor list.
CityWA
Posted
Feb 13, 2026
Dec 31, 2026
2026 vendor list.
Chelan County Fire Protection District 7
Special DistrictWA
Posted
Apr 24, 2026
Dec 31, 2026
2026 vendor list.
From the first pre-RFP signals to the published RFP and its files.
Budget
248 days before RFP
The 2026 budget lists $4,215,000 for electric capital improvements including substation, feeder, line, pole, and system replacements.
79 CAPITAL IMPROVEMENTS 80 Underwood Substation - Spare Transformer Replacement $ 675,000 81 Underground Replacement 420,000 82 Overhead Replacement 315,000 83 Cape Horn Substation & Feeder Rebuild 2,000,000 84 Pole Replacements 500,000 85 System Improvements - Misc 205,000 86 Office Building Improvements 100,000 87 Total Capital Improvements 4,215,000
Skamania County PUD No. 1 FY2026 Budget
Budget · Oct 7, 2025
Board meeting
208 days before RFP
The Cape Horn equipment evaluation recommended procuring conforming circuit breakers, reclosers, potential transformers, and PT/CT metering units while rejecting and rebidding the 115-kV breakers and voltage regulators.
7. CONCLUSION We have evaluated the equipment proposals for six types of equipment from three bidders, and below is the summary of the recommendations. Item Recommendation Basis 1. 115 kV 1200 A Circuit Breaker Reject and Rebid Non-Conforming Lead Time 2. 15 kV 1200 A Circuit Breaker Accept (GEN PAC) Meet requirements & Price 3. 15 kV 800 A Circuit Recloser…
Skamania County Pud #1 Board Of Commissioners Meeting Agenda
Board meeting · Nov 16, 2025
Board meeting
206 days before RFP
The Board recorded approval and support of the Cape Horn substation equipment bid evaluations.
Skamania County Public Utility District #1 Regular Meeting of the Board of Commissioners November 18, 2025 A regular meeting of the Board of Commissioners was called to order by Commissioner Liz Green at 9:00 a.m. The following persons were in attendance at the PUD office: Commissioner Liz Green, Commissioner Dave McKenzie, Commissioner Dan Boyes, General…
Board meeting
178 days before RFP
The WSP amendment proposed Underwood projects for emergency generators, spring-diversion piping, a 250,000-gallon storage tank with transmission piping, and pump-station and distribution improvements.
9.6 Comprehensive List of CIPs Below is a comprehensive list of proposed capital improvement projects for the 20-year planning period. Projects include a single letter prefix which identifies the project category as follows: S = Source R = Storage P = Pumping D = Distribution G = General Project IDs followed by an asterisk "\*" indicate that the project was…
RFP published
Proposals due (34 days left)
Skamania County PUD #1 Board of Commissioners Meeting
Board meeting · Nov 18, 2025
Skamania County PUD No 1 Meeting Agenda
Board meeting · Dec 16, 2025
The PUD recognizes the need to replace older water mains to reduce leaks and minimize risk of water main breaks in the system. Their approach is to identify areas of old or leaking pipe and create projects to replace those sections of pipe through their capital plan. On average, the PUD has replaced approximately 1,100 feet of water main each year since…
Skamania County PUD No 1 Meeting Agenda
Board meeting · Dec 16, 2025
P2\*. Galligan BPS Rebuild: This project would involve modifying or replacing the existing Galligan BPS to address capacity deficiencies and aging infrastructure. The project is expected to include replacement of the three existing pump / motors to obtain a maximum capacity of approximately 380 gpm to meet buildout demand. Work is also expected to include…
Skamania County PUD No 1 Meeting Agenda
Board meeting · Dec 16, 2025
D2\*. Scoggins Rd Phase 2 Waterline & PRV Improvements: This project continues upon Phase 1, which was completed in the fall of 2012. This improvement will increase pressure and capacity by connecting PZ 4 into PZ 3 and feeding PZ 4 via gravity. This extension would allow abandonment of the Little Buck Creek Reservoir and the Little Buck Creek BPS. A new…
Skamania County PUD No 1 Meeting Agenda
Board meeting · Dec 16, 2025