Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of approx. 180 LF of 36" steel primary influent pipe with FRP, preparation of approx. 1650 LF of 54” reinforced concrete pipe and Primary Diversion Structure for condition assessment by others, installation of a new magnetic flow meter on a 36” steel pipe, hypochlorite mix box improvements, and demolition of an existing polymer tank and installation of a new polymer tank.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide Southwest Water Treatment Plant Upgrades and Treatment Improvement.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Provide Southwest Water Treatment Plant Upgrades and Treatment Improvement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Water Treatment Plant Improvements including controls, process and chemical room upgrades, well improvements, and other miscellaneous items.
Posted Date
Jan 12, 2026
Due Date
Feb 5, 2026
Release: Jan 12, 2026
Close: Feb 5, 2026
Water Treatment Plant Improvements including controls, process and chemical room upgrades, well improvements, and other miscellaneous items.
AvailableThe project is divided into three separate contracts for the Wastewater Treatment Plant Improvement Project: Contract No. 1A – General Construction; Contract No. 1B – Electrical Construction; and Contract No. 1C - Mechanical Construction.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
The project is divided into three separate contracts for the Wastewater Treatment Plant Improvement Project: Contract No. 1A – General Construction; Contract No. 1B – Electrical Construction; and Contract No. 1C - Mechanical Construction.
AvailableThe Project consists of the replacement of the existing surface aerators with the installation of a new air diffuser system. Also included is the construction of a metal building and associated sitework.
Posted Date
Jan 1, 2026
Due Date
Jan 28, 2026
Release: Jan 1, 2026
Close: Jan 28, 2026
The Project consists of the replacement of the existing surface aerators with the installation of a new air diffuser system. Also included is the construction of a metal building and associated sitework.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.