Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project involves the reconstruction of an existing storm sewer, the replacement of 14 variously sized inlets, trench restoration, ada curb ramps, and all curb and sidewalk replacements associated with this work. Work also involves the removal of all existing cmp and replacement with hdpe pipe, replacement of an existing standard type m inlet, installation of a precast concrete endwall, removal and replacement of rip-rap with r-4 rip-rap, installation replacement of trees, and all site restoration including, but not limited to, trench restoration, driveway, driveway apron, and sidewalk repairs. This project also includes an alternate/add-on for site a to reconfigure the pipe layout that includes the use of flowable fill to fill two segments of existing pipe, the installation of 2 inlet boxes, installation of 36-inch hdpe and 57-inch x 38- inch cmpa, as well as all trench and roadway excavation and restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Village of Downers Grove is soliciting competitive bids for the 2026 Storm Sewer Replacement project, including construction of new storm sewer and related structures, street resurfacing at Lincoln St and Middaugh Ave, and installation of two storm manholes and storm sewer at 1051 Candlewood. Electronic plan documents and bid specifications are provided through the buyer's plan-room and bidders must provide a 5% bid bond. The solicitation (Call for Bids CFB-5-0-2026/WS, Project SW-070) was posted 2026-01-28 and is scheduled to close on 2026-02-11, and is not a grant.
Posted Date
Jan 28, 2026
Due Date
Feb 11, 2026
Release: Jan 28, 2026
Close: Feb 11, 2026
The Village of Downers Grove is soliciting competitive bids for the 2026 Storm Sewer Replacement project, including construction of new storm sewer and related structures, street resurfacing at Lincoln St and Middaugh Ave, and installation of two storm manholes and storm sewer at 1051 Candlewood. Electronic plan documents and bid specifications are provided through the buyer's plan-room and bidders must provide a 5% bid bond. The solicitation (Call for Bids CFB-5-0-2026/WS, Project SW-070) was posted 2026-01-28 and is scheduled to close on 2026-02-11, and is not a grant.
AvailableThe City of Woodland is soliciting formal bids for the 2026 Water & Sewer Replacement Project (CIP 25-01) which includes replacement of roughly 5,080 feet of water main and 2,320 feet of sewer main. The project scope also encompasses approximately 141 water service laterals, 13 fire hydrants, 5 new sewer manholes, and associated trench repaving. The city estimated the base bid improvements at approximately $4.3–$4.8 million and requires all work be performed per the project specifications.
Posted Date
Jan 27, 2026
Due Date
Feb 19, 2026
Release: Jan 27, 2026
Close: Feb 19, 2026
The City of Woodland is soliciting formal bids for the 2026 Water & Sewer Replacement Project (CIP 25-01) which includes replacement of roughly 5,080 feet of water main and 2,320 feet of sewer main. The project scope also encompasses approximately 141 water service laterals, 13 fire hydrants, 5 new sewer manholes, and associated trench repaving. The city estimated the base bid improvements at approximately $4.3–$4.8 million and requires all work be performed per the project specifications.
The City of Ormond Beach is soliciting bids for the cured-in-place lining of approximately 8,900 linear feet of storm pipe and 6,200 linear feet of sanitary sewer. The project includes televised recorded inspections and the submission of a findings report for the specified infrastructure. Bids are due by February 25, 2026, with an estimated budget between $1,000,000 and $5,000,000.
Posted Date
Jan 25, 2026
Due Date
Feb 25, 2026
Release: Jan 25, 2026
Close: Feb 25, 2026
The City of Ormond Beach is soliciting bids for the cured-in-place lining of approximately 8,900 linear feet of storm pipe and 6,200 linear feet of sanitary sewer. The project includes televised recorded inspections and the submission of a findings report for the specified infrastructure. Bids are due by February 25, 2026, with an estimated budget between $1,000,000 and $5,000,000.
AvailableThe project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
Posted Date
Jan 13, 2026
Due Date
Feb 5, 2026
Release: Jan 13, 2026
Close: Feb 5, 2026
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis