Aug 15, 2026
Closes
Aug 28, 2026
Liberty Street Storm Sewer Improvements
Work consists of: 6 EA, PADot Type 4 inlet; 45 LF, 15" HDPE Type N-12; 575 LF, 24" HDPE Type N-12.
Description: Base Bid - •Storm Sewer RCP Pipe 24" - 105 LF Storm Sewer RCP Pipe 15" – 15 LF •Storm Sewer RCP Pipe 12 " – 10 LF Precast Storm Manhole 5-ft Diameter – 2 Each, HMA Pavement 4LT 28-58S – 20 TON Landscaping Restoration – 320 SY Alternate Bid 1 - Storm Sewer RCP Pipe 24" - 100 LF Precast Storm Manhole 5-ft Diameter – 1 Each Precast Storm Inlet 4-ft Diameter – 1 Each Precast Storm Inlet 3-ft Diameter – 1 Each Medium RipRap – 20 TON Landscaping Restoration – 320 SY Alternate Bid 2 - Fox Lane & Goodrich Lane Area Storm Sewer PVC Pipe 12 Inch - 340 LF Storm Sewer Nyloplast Drain Basin, 24" – 5 Each HMA Pavement 4LT 28-58S – 25 TON Landscaping Restoration – 950 SY
City · WI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Village of Fox Point.
These related opportunities are still open for bidding.
Aug 15, 2026
Closes
Aug 28, 2026
Work consists of: 6 EA, PADot Type 4 inlet; 45 LF, 15" HDPE Type N-12; 575 LF, 24" HDPE Type N-12.
CountyKS
Aug 18, 2026
Closes
Sep 15, 2026
Identify and repair storm sewer line that connects the main courthouse surface parking drains into the storm sewer city main.
CityOH
-
Closes
Sep 16, 2026
City of Columbus Public Utilities posted an IFB, rather than a grant program, for the Kent Fairwood Storm Sewer Improvements & Gault Street Waterline Improvements project. The matching project description says the green-infrastructure work will construct 35 rain gardens in several locations throughout the project area. The estimated construction cost is approximately $8.5 million, with construction anticipated to begin in the fourth quarter of 2026 and substantial completion within 540 days.
CityCA
Aug 24, 2026
Closes
Sep 30, 2026
Provide Storm Drain Improvements Project.