Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Garland, Texas is soliciting sealed bids for its 2026 Sidewalk Program, covering removal and replacement of sidewalks, curb and related concrete work at various locations citywide. The solicitation is an RFB (REQ00001038), posted on December 29, 2025, with a pre-bid meeting on January 20, 2026 and bids due January 27, 2026 at 3:00 PM CT via the IonWave portal. A 5% bid bond is required with the bid and performance, payment, and two-year maintenance bonds are required upon award.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx 12,000 SF of 4" sidewalk removal and replacement; 3,000 SF of 6" sidewalk removal and replacement; 9,000 SF of lawn restoration; 3,000 SF of Saw cut; 350 LF of curb removal and replacement; 200 SF of 7" sidewalk ramp removal and replacement; detectable warning surface.
Posted Date
Jan 5, 2026
Due Date
Feb 3, 2026
Release: Jan 5, 2026
Close: Feb 3, 2026
Work includes approx 12,000 SF of 4" sidewalk removal and replacement; 3,000 SF of 6" sidewalk removal and replacement; 9,000 SF of lawn restoration; 3,000 SF of Saw cut; 350 LF of curb removal and replacement; 200 SF of 7" sidewalk ramp removal and replacement; detectable warning surface.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 15 EA remove and dispose of tree roots 3" or greater in dia; 2,100 SY for sawing, removal and disposal of existing reinforced or non-reinforced concrete, street, median, alley, sidewalk,parking lot or drive approach; 70 LF for sawing, removal and disposal of existing reinforced or non-reinforced concrete curb; 70 LF for sawing, removal and disposal of existing asphalt sidewalk; 70 LF for removal and disposal of variable height concrete retaining wall; 70 CY for clean and well graded borrow delivered to job site requiring fill including hauling, placement and compaction. See outside link.
Posted Date
Dec 8, 2025
Due Date
Jan 27, 2026
Release: Dec 8, 2025
Close: Jan 27, 2026
Work includes 15 EA remove and dispose of tree roots 3" or greater in dia; 2,100 SY for sawing, removal and disposal of existing reinforced or non-reinforced concrete, street, median, alley, sidewalk,parking lot or drive approach; 70 LF for sawing, removal and disposal of existing reinforced or non-reinforced concrete curb; 70 LF for sawing, removal and disposal of existing asphalt sidewalk; 70 LF for removal and disposal of variable height concrete retaining wall; 70 CY for clean and well graded borrow delivered to job site requiring fill including hauling, placement and compaction. See outside link.
AvailableWork includes 500 SF portland cement concrete sidewalk 5"; 100 SF detectable warning tiles; 16,000 SF concrete sidewalk removal & replacement; 500 SF sidewalk removal with restoration.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
Work includes 500 SF portland cement concrete sidewalk 5"; 100 SF detectable warning tiles; 16,000 SF concrete sidewalk removal & replacement; 500 SF sidewalk removal with restoration.
Available2026 concrete curb and sidewalk bid, which involves the replacement of existing concrete sidewalk, concrete curb, and driveway aprons on various streets in the township.
Posted Date
Dec 21, 2025
Due Date
Jan 23, 2026
Release: Dec 21, 2025
Close: Jan 23, 2026
2026 concrete curb and sidewalk bid, which involves the replacement of existing concrete sidewalk, concrete curb, and driveway aprons on various streets in the township.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →