CityTX
Posted
Oct 7, 2026
Dec 16, 2026
2026 Roadway Reconstruction Projects (Request for Proposal)
Roadway Reconstruction Projects.
Description: Consists of rehabilitating 2,870 LF of existing 10" diameter sewer via pipe-bursting and upsizing to 18" diameter.Location B is on Andrew Road from Donaldson Way to Wilson Way. Work primarily consists of rehabilitating 1,760 linear feet of existing 6" diameter sewer via pipe-bursting and upsizing to 8" diameter.
City · CA, US
From the first pre-RFP signals to the published RFP and its files.
Budget
436 days before RFP
The FY2025-26 budget lists Broadway Sewer Rehab from Crawford to Donaldson at $1,790,880 for the fiscal year and $1,850,000 total.
KEY PROJECTS Project FY 2025--26 Amount Total Project Budget Green Island Road Reconstruction and Widening $15,079,903 $19,631,733 Rancho Del Mar Paving & Utility Improvement $7,515,247 $8,071,000 Rio Del Mar Extension $5,000,000 $5,000,000 Melvin Sidewalk $2,639,219 $2,795,600 Knightsbridge Reconstruction & Water Main $1,862,188 $2,676,900 Green Island…
City of American Canyon FY2025-26 Budget
Budget · Jul 1, 2025
CIP fund, um so there are several projects um that are in the works for wastewater. Um so there's the the sewer rehab that goes from Don Crawford to Donaldson Way. Um there's the Andrew Road repair. um that's carryover from from this year and then the computer projects SCADA and the Cardahena manhole repair and the sludge removal and the capa and the…
American Canyon City Council Regular City Council Meeting
Board meeting · May 20, 2025
Board meeting
338 days before RFP
Staff reported completed design for the Broadway sewer SS4 contract and proposed packaging the Andrew sewer repair with it.
ongoing and complete design of the Broadway sewer SS4 contract and we're looking at packaging the Andrew sewer repair with that project. This includes
American Canyon City Council Regular City Council Meeting
Board meeting · Oct 7, 2025
Strategic plan
296 days before RFP
The adopted General Plan reported sewer hydraulic deficiencies and identified near- and long-term capital projects to replace undersized pipes and pumps.
General Plan. The existing sewer system was evaluated under peak dry weather flow and peak wet weather flow conditions. The analysis showed there are hydraulic deficiencies in existing pipelines and peak flows exceed the capacity of the Main Basin, Sunset Meadows, and Green Island Pump Stations. The Sewer Master Plan identifies near-term and long-term…
City of American Canyon General Plan 2040
Strategic plan · Nov 18, 2025
Board meeting
142 days before RFP
Staff reported that plans and specifications for sewer upgrades on Highway 29 and Andrew Road were being finalized for advertisement.
the um con uh sewer upgrades on Highway 29 and the Andrew Roadster um that we're finalizing the PSN. So that should be going out soon in this quarter. And then
American Canyon City Council Regular Meeting
Board meeting · Apr 21, 2026
RFP published
Proposals due (141 days left)
Decision makers connected to this RFP from City of American Canyon.
Adjacent opportunities open for bidding right now.
CityTX
Posted
Oct 7, 2026
Dec 16, 2026
Roadway Reconstruction Projects.
Posted
Nov 5, 2026
Nov 19, 2026
Work includes approx. 371 CY of excavation; 4 EA of erosion control; 1,100 CY of Subgrade Undercutting, Type II; 349 SY of 6" Aggregate Base; 1,509 SY of HMA Base Crushing and Shaping; 9,260 SY of Cold Milling HMA Surface; 3,172 SY of HMA Surface, Re; 588 LF of Curb, HMA, Modified; 3 SF of Sign, Type IIIB; 749 LF of 4" pavement marking waterbone; 3,900 SY of seeding and mulching; 350 LF of Video Taping Sewer and Culv Pipe; 3 EA of Dr Structure, Cleaning.
Kansas Department of Transportation
State AgencyKS
Posted
Nov 5, 2026
Dec 2, 2026
Provide construction inspection services procurement for multiple highway resurfacing and grading projects.
CountyNJ
Posted
Sep 21, 2026
Dec 9, 2026
Authority seeks to engage a vendor as rehabilitation services.