Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The proposed construction consists of the installation of approx. 3,000 FT of 8", 10", and 18" CIPP sanitary sewer pipe; including lateral reinstatements; trimming of protruding taps; and other miscellaneous items of work. See outside link for more details.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Project will include rehabilitation work for existing 8", 10", 12", and 15" sanitary sewer pipe including approx: 13,248 LF of Cured-in-Place-Pipe Structural Fiberglass Liner and required service sealings. The work shall include all bypass pumping, erosion and traffic control, and other related improvements and appurtenances.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
The Project will include rehabilitation work for existing 8", 10", 12", and 15" sanitary sewer pipe including approx: 13,248 LF of Cured-in-Place-Pipe Structural Fiberglass Liner and required service sealings. The work shall include all bypass pumping, erosion and traffic control, and other related improvements and appurtenances.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD service includes construction by cured-in-place lining, pre-televising services, project design,construction management and general conditions for the improvement of approx. 5,000 LF of sanitary and storm sewer.
Posted Date
Dec 21, 2025
Due Date
Jan 19, 2026
Release: Dec 21, 2025
Close: Jan 19, 2026
DESIGN-BUILD service includes construction by cured-in-place lining, pre-televising services, project design,construction management and general conditions for the improvement of approx. 5,000 LF of sanitary and storm sewer.
AvailableProject consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the cured-in-place pipe method and manhole rehabilitation. There is approx 5,900 LF of 8", 10", 24", and 36" sewer lines that need to be lined using the cured-in-place pipe method, and approx 100 VF of manhole that needs level c manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.
Posted Date
Dec 8, 2025
Due Date
Jan 22, 2026
Release: Dec 8, 2025
Close: Jan 22, 2026
Project consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the cured-in-place pipe method and manhole rehabilitation. There is approx 5,900 LF of 8", 10", 24", and 36" sewer lines that need to be lined using the cured-in-place pipe method, and approx 100 VF of manhole that needs level c manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.
AvailableThe project consists of televising approx. 22,455 LF of sanitary sewer main, and associated work.
Posted Date
Dec 23, 2025
Due Date
Jan 13, 2026
Release: Dec 23, 2025
Close: Jan 13, 2026
The project consists of televising approx. 22,455 LF of sanitary sewer main, and associated work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →