CityIL
Jul 30, 2026
Closes
Aug 17, 2026
2026 Sewer Lining Project
Work includes 175 EA reinstating service line connections; 8,195 EA full-length sewer liner (8"); 885 LF full-length sewer liner (10"); 172 LF full-length sewer liner (6"); 18 EA shorty t-liners 8" x 4" or 6" x 8'; 1 EA shorty t-liners 6" x 4" or 6" x 8'; 2 EA shorty t-liners 10" x 8" or 6" x 8'; 172 LF cleaning and inspection sewer main (6"); 8,195 LF cleaning and inspection sewer main (8"); 885 LF cleaning and inspection sewer main (10"); 21 EA 11 lateral cleaning and televising (4") (6").