Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes but is not limited to, cleaning, televising and manhole to manhole cured-in-place pipe lining approx. 7,500 LF and 320 storm sewer pipe at various locations around the Township.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of lining 8,552 LF of 8" diameter, 1,373 LF of 10" diameter, and 694 LF of 12" diameter sanitary sewer; including heavy cleaning, protruding obstacle removal, service reinstatement, traffic control, and related restoration.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Close: Feb 12, 2026
Work consists of lining 8,552 LF of 8" diameter, 1,373 LF of 10" diameter, and 694 LF of 12" diameter sanitary sewer; including heavy cleaning, protruding obstacle removal, service reinstatement, traffic control, and related restoration.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes sewer lining of approx 9,650 LF of pipe and cleaning/televising of approx 1,450 feet of sewer lines at various locations throughout the City. Sizes of sewers for lining range from 8" to 21" in diameter.
Posted Date
Jan 15, 2026
Due Date
Jan 29, 2026
Release: Jan 15, 2026
Close: Jan 29, 2026
Work includes sewer lining of approx 9,650 LF of pipe and cleaning/televising of approx 1,450 feet of sewer lines at various locations throughout the City. Sizes of sewers for lining range from 8" to 21" in diameter.
The City of Ormond Beach is soliciting bids for the cured-in-place lining of approximately 8,900 linear feet of storm pipe and 6,200 linear feet of sanitary sewer. The project includes televised recorded inspections and the submission of a findings report for the specified infrastructure. Bids are due by February 25, 2026, with an estimated budget between $1,000,000 and $5,000,000.
Posted Date
Jan 25, 2026
Due Date
Feb 25, 2026
Release: Jan 25, 2026
Close: Feb 25, 2026
The City of Ormond Beach is soliciting bids for the cured-in-place lining of approximately 8,900 linear feet of storm pipe and 6,200 linear feet of sanitary sewer. The project includes televised recorded inspections and the submission of a findings report for the specified infrastructure. Bids are due by February 25, 2026, with an estimated budget between $1,000,000 and $5,000,000.
Available2026 sanitary sewer rehabilitation. Construct 2026 Sanitary Sewer Rehabilitation project including all labor, materials, and equipment necessary to construct approx. 2,438 LF of Cured in Place Pipe (CIPP) sewer main lining, pre and post internal video inspection, prerehabilitation cleaning, root cutting, protruding service removal, service reinstatement, pressure testing of service connections, injection grouting of service connections, mobilization, traffic control and miscellaneous work, including cleanup.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Close: Feb 12, 2026
2026 sanitary sewer rehabilitation. Construct 2026 Sanitary Sewer Rehabilitation project including all labor, materials, and equipment necessary to construct approx. 2,438 LF of Cured in Place Pipe (CIPP) sewer main lining, pre and post internal video inspection, prerehabilitation cleaning, root cutting, protruding service removal, service reinstatement, pressure testing of service connections, injection grouting of service connections, mobilization, traffic control and miscellaneous work, including cleanup.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →