Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
In general, the work consists of the following approximate quantities: 4800 LF 8" Sewer Rehabilitation, CIPP 360 LF Manhole Rehabilitation Together with bypass pumping, sewer pipe cleaning, televising, joint grouting, erosion control, traffic control, restoration and related appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Project will include rehabilitation work for existing 8", 10", 12", and 15" sanitary sewer pipe including approx: 13,248 LF of Cured-in-Place-Pipe Structural Fiberglass Liner and required service sealings. The work shall include all bypass pumping, erosion and traffic control, and other related improvements and appurtenances.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
The Project will include rehabilitation work for existing 8", 10", 12", and 15" sanitary sewer pipe including approx: 13,248 LF of Cured-in-Place-Pipe Structural Fiberglass Liner and required service sealings. The work shall include all bypass pumping, erosion and traffic control, and other related improvements and appurtenances.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of cured in place pipe (CIPP) liners within existing sanitary sewer pipes, pre- and post-liner video inspection, internal reinstatement of service laterals, cleaning and preparing the existing host pipes, and incidental items.
Posted Date
Dec 19, 2025
Due Date
Jan 13, 2026
Release: Dec 19, 2025
Close: Jan 13, 2026
Installation of cured in place pipe (CIPP) liners within existing sanitary sewer pipes, pre- and post-liner video inspection, internal reinstatement of service laterals, cleaning and preparing the existing host pipes, and incidental items.
AvailableInstall approx 2,044 LF of sanitary sewer cured-in-place pipe (CIPP) liner at various locations within the City.
Posted Date
Jan 8, 2026
Due Date
Jan 22, 2026
Release: Jan 8, 2026
Close: Jan 22, 2026
Install approx 2,044 LF of sanitary sewer cured-in-place pipe (CIPP) liner at various locations within the City.
AvailableProject consists of one prime Contract bid as a Base Bid and generally consists of the following: traffic control; bypass pumping, cleaning & televising the existing 36-inch sanitary sewer, 36-inch CIPP liner, testing & sealing lateral connections; and any necessary erosion control to complete the work. Pre-construction closed circuit televising reports are available upon request.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
Project consists of one prime Contract bid as a Base Bid and generally consists of the following: traffic control; bypass pumping, cleaning & televising the existing 36-inch sanitary sewer, 36-inch CIPP liner, testing & sealing lateral connections; and any necessary erosion control to complete the work. Pre-construction closed circuit televising reports are available upon request.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →