Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of services for the 2026 Roadway Project, including asphalt section milling, overlay, and roadway excavation and reconstruction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Approx 4,300 LF Inline CIPP, 8"-9" VCP Sanitary Sewer; 1 LS Sanitary Sewer Bypass; 1,100 LF 8" and 16" DIP Watermain; 16,500 LF Remove and Replace Curb and Gutter; 22,000 TON Bituminous Wearing Course - Roadway; 1,000 TON Bituminous Wearing Course - Trail; etc.
Posted Date
Jan 4, 2026
Due Date
Jan 29, 2026
Release: Jan 4, 2026
Close: Jan 29, 2026
Approx 4,300 LF Inline CIPP, 8"-9" VCP Sanitary Sewer; 1 LS Sanitary Sewer Bypass; 1,100 LF 8" and 16" DIP Watermain; 16,500 LF Remove and Replace Curb and Gutter; 22,000 TON Bituminous Wearing Course - Roadway; 1,000 TON Bituminous Wearing Course - Trail; etc.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pavement milling, hot-mix asphalt (HMA) binder and surface course installation, HMA patching, manhole structure repair, replacement, and adjustments, sewer repairs, PCC curb and gutter removal and replacement, PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, aggregate shoulder installation, parkway restoration, thermoplastic pavement markings, and all incidental and collateral work necessary to complete the project.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Pavement milling, hot-mix asphalt (HMA) binder and surface course installation, HMA patching, manhole structure repair, replacement, and adjustments, sewer repairs, PCC curb and gutter removal and replacement, PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, aggregate shoulder installation, parkway restoration, thermoplastic pavement markings, and all incidental and collateral work necessary to complete the project.
AvailableThe Town of Paradise is soliciting bids for the Off-System Roadway Rehabilitation - 2026 construction project to perform roadway excavation, asphalt concrete overlay, full depth recycling and related work. The contract is federally funded (FEMA and HUD CDBG-DR) and includes compliance with federal special provisions; the Engineer's Estimate is approximately $8,007,834. Bidding opened on 2025-12-19 and the solicitation closes on 2026-01-26, and the procurement is a construction Invitation for Bid (not a grant).
Posted Date
Dec 19, 2025
Due Date
Jan 26, 2026
Release: Dec 19, 2025
Close: Jan 26, 2026
The Town of Paradise is soliciting bids for the Off-System Roadway Rehabilitation - 2026 construction project to perform roadway excavation, asphalt concrete overlay, full depth recycling and related work. The contract is federally funded (FEMA and HUD CDBG-DR) and includes compliance with federal special provisions; the Engineer's Estimate is approximately $8,007,834. Bidding opened on 2025-12-19 and the solicitation closes on 2026-01-26, and the procurement is a construction Invitation for Bid (not a grant).
AvailableProject consist of approx 3,307 CY of Excavation; 1,228 TON of HMA Binder course IL-19.0 N50; 16,240 SF of 5" Portland cement concrete sidewalk; 5,262 FT of Curb and gutter; 2,761 FT of 4" pavement marking. See outside link.
Posted Date
Jan 8, 2026
Due Date
Jan 22, 2026
Release: Jan 8, 2026
Close: Jan 22, 2026
Project consist of approx 3,307 CY of Excavation; 1,228 TON of HMA Binder course IL-19.0 N50; 16,240 SF of 5" Portland cement concrete sidewalk; 5,262 FT of Curb and gutter; 2,761 FT of 4" pavement marking. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →