Union Boulevard Water Main and Roadway Improvements (CDBG Funded) RFP
Union Boulevard Water Main and Roadway Improvements.
Description: Roadway improvements program.
City · NJ, US
Adjacent opportunities open for bidding right now.
CityNJ
Posted
Nov 20, 2026
Dec 10, 2026
Union Boulevard Water Main and Roadway Improvements.
CountyNJ
Posted
Nov 20, 2026
Dec 10, 2026
Sealed bids are requested for water main replacement and roadway improvements on Union Boulevard in the Borough of Wallington, funded by the Bergen County Community Development Block Grant (CDBG) Program. Contract documents and plans prepared by David Juzmeski, P.E., P.P., and James J. Lyle, P.E. will be available from the Engineer and bids must include required affidavits, bid security, and surety. The contract is subject to federal prevailing wage rules and numerous New Jersey registration and affirmative action requirements, and contractors must be registered in CCR and have a DUNS number.
CityTX
Posted
-
Dec 10, 2026
Provide roadway improvements - approx., 11,108 LF of roadway improvements within the city will be completed. The work includes rehabilitating existing limestone or gravel roads with asphalt millings. Drainage improvements - removal of debris blockage, sediment aggradation within existing culverts, and woody vegetation within existing drainage ditches.
Chester County Solid Waste Authority
Special DistrictPA
Posted
Nov 5, 2026
Dec 11, 2026
Installation of erosion and sediment controls, including filter socks, inlet protection, and erosion control blanket. Grading, compaction, replacement of unsuitable material, and installation of aggregate base and shoulders. Road 1 improvements, including its connection to Road 2, with geotextile, aggregate surfacing, aluminum gravel edging, and riprap. Road 2 improvements, including slope grading, topsoil placement, aggregate base, and asphalt paving. Road 3 improvements, including the flare access road and roadside expansion, with aggregate base, asphalt paving, geotextile, and riprap. Milling and resurfacing of selected existing pavement areas. Road-edge and slope restoration, including seeding and mulching. Installation of four speed bumps and reinstallation of road rails. Adjustment of existing electrical rims and repair and refilling of gabion baskets. Aggregate compaction testing and preparation of as-built drawings.
Decision makers connected to this RFP from Borough of North Arlington.
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
341 days before RFP
The Borough proposed a $352,170 Bergen County CDBG project for roadway improvements to Crystal Street.
R-257-25 RESO RE: AUTHORIZING A PY26-27 BERGEN COUNTY COMMUNITY DEVELOPMENT BLOCK GRANT APPLICATION WHEREAS, a PY25-26 Bergen County Community Development Block Grant ("CDBG") totaling $352,170.00 has been proposed by the Borough of North Arlington for the roadway improvements to Crystal Street within the Borough of North Arlington; and WHEREAS, this…
Borough of North Arlington Mayor and Council Regular Meeting
Agenda packet · Dec 11, 2025
Board meeting
131 days before RFP
Borough staff were drafting preliminary plans, specifications, and an estimate for the 2026 roadway improvements for NJDOT submission and anticipated bidding by year-end.
2026 roadway improvements, we are currently in the middle of drafting the preliminary plan specifications and estimate for submission to DOT. Hopefully we the permission from DOT to bid relatively shortly and put and put that out for bid by the end of this year as well. Earlier today we
Borough of North Arlington Regular Meeting
Board meeting · Jul 9, 2026
Agenda packet
68 days before RFP
North Arlington finally adopted a bond ordinance authorizing $1,360,000 for resurfacing Borough roads as the 2026 Road Improvement Program, with related curb, sidewalk, and drainage improvements where necessary.
The bond ordinance, the summary terms of which are included herein, has been finally adopted by the Borough Council of the Borough of North Arlington, in the County of Bergen, State of New Jersey, on September 10, 2026, and the 20-day period of limitation within which a suit, action or proceeding questioning the validity of such ordinance can be commenced,…
Board meeting
68 days before RFP
Borough staff reported that the 2026 roadway improvements were nearly ready for DOT submission, with Beaver Street substituted for Forest Street, Arlington Street added, and the Rip Collins Annex Lot included as an alternate bid.
2026 roadway improvements, we are about ready to submit to DOT. We had a meeting earlier today to discuss that, for the most part, we have a couple of scope modifications. First one will be to swap Forest Street with Beaver Street. Forest Street was paved by PSE&G so we would like to switch Forest Street to Beaver Street, so they will be reaching out to DOT…
Borough of North Arlington Mayor and Council Regular Meeting
Board meeting · Sep 10, 2026
RFP published
Proposals due (9 days left)
Borough of North Arlington Regular Meeting
Agenda packet · Sep 10, 2026