Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 10 EA removal of structure, intake; 4 EA remove-replace intake floor; 7 EA intake, type sw-501; 1 EA intake, type sw-505; 1 ea manhole adjustment,minor; 305.7 SY removal of sidewalk; 39 LF curb and gutter; 7 SY removal of driveway; 7 SY driveway, paved, PCC, 6"; 156.5 SY sidewalk, pcc, 4"; 135. 7 SY sidewalk, pcc, 6"; 208 SF detectable warnings; 12,298.8 SY full-depth patches, 8" PCC non reinforced, c mix; 400 TON subgrade over-excavation; 1 LS temporary traffic control; 25 cday portable dynamic message signs. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Urbandale seeks bids for its 2026 PCC Patch Program Phase 1, a concrete patching project including full-depth patching, sidewalk work, ADA ramps, and related items. The bid was published on January 7, 2026 and includes major items such as removals, restoration, traffic control, erosion control, and survey. Bids are due January 28, 2026 at 1:30 PM Central Time with project completion targeted for September 18, 2026.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
The City of Urbandale seeks bids for its 2026 PCC Patch Program Phase 1, a concrete patching project including full-depth patching, sidewalk work, ADA ramps, and related items. The bid was published on January 7, 2026 and includes major items such as removals, restoration, traffic control, erosion control, and survey. Bids are due January 28, 2026 at 1:30 PM Central Time with project completion targeted for September 18, 2026.
AvailableThe City of West Des Moines, Iowa is soliciting bids for the 2026 HMA Resurfacing Program Phase 1 to perform roadway resurfacing and related work including curb and gutter replacement, multiple asphalt overlay courses, full depth PCC patching, intake and manhole adjustments, sidewalk reconstruction, and traffic control. Plans and specifications are prepared by I&S Group, Inc. The contract requires work to begin within ten days of notice to proceed and be completed by November 6, 2026 with liquidated damages of $500/day for delay.
Posted Date
Jan 21, 2026
Due Date
Feb 4, 2026
Release: Jan 21, 2026
Close: Feb 4, 2026
The City of West Des Moines, Iowa is soliciting bids for the 2026 HMA Resurfacing Program Phase 1 to perform roadway resurfacing and related work including curb and gutter replacement, multiple asphalt overlay courses, full depth PCC patching, intake and manhole adjustments, sidewalk reconstruction, and traffic control. Plans and specifications are prepared by I&S Group, Inc. The contract requires work to begin within ten days of notice to proceed and be completed by November 6, 2026 with liquidated damages of $500/day for delay.
Project consist of approx 700 CY of excavation; 3,900 CY of 8 thick Pavement; 320 SY of 6" thick sidewalk PCC class C; 441 SY of 8" thick full depth Patches. See outside link.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Project consist of approx 700 CY of excavation; 3,900 CY of 8 thick Pavement; 320 SY of 6" thick sidewalk PCC class C; 441 SY of 8" thick full depth Patches. See outside link.
AvailableProject consist of approx 700 CY of excavation; 3,900 CY of 8 thick Pavement; 320 SY of 6" thick sidewalk PCC class C; 441 SY of 8" thick full depth Patches. See outside link.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Project consist of approx 700 CY of excavation; 3,900 CY of 8 thick Pavement; 320 SY of 6" thick sidewalk PCC class C; 441 SY of 8" thick full depth Patches. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis