Closing soon

2026 Pavement Rehabilitation Project (Request for Proposal)

Description: Generally consists of the following: construction of asphaltic pavement inlays and overlays; construction of aggregate base for roadways; asphalt concrete removal (grinding); roadway excavation; temporary signage, protection, and traffic control; striping and pavement markings; construction of concrete curbs ramps and sidewalk. 1 LS mobilization; 1 LS temporary work zone traffic control, complete for commercial street; 1 LS clearing and grubbing; 1,225 CY general excavation; 1,355 SY 12" depth subgrade stabilization; 2939 SY subgrade geotextile; 19 EA adjusting boxes; 1 EA replace water valve boxes; 12,090 SY cold plane pavement removal, 0-2" deep; 817 CY 3/4" - 0 aggregate base; 1,005 ton level 2, 1/2" dense ACP mixture; 3,300 LF crack sealing; 2656 SY 2" asphalt concrete pavement repair; 1,848 SY 4" asphalt concrete pavement repair; 221 SY 6" asphalt concrete pavement repair; 343 SY 7" asphalt concrete pavement repair; 1 EA extra for speed cushion; 9 EA mono-directional white type IAR markers; 57 EA bi-directional yellow type IAR markers; 9 EA bi-directional blue type IAR markers; 4,700 LF thermoplastic, extruded, surface, nonprofiled; 480 SF pavement bar, type B-HS; 1 EA Pavement legend, type B-HS: arrows; 2 EA pavement legend, type B-HS "bump"; 1 EA pavement legend, type B-HS: "speed cushion"; 1 LS detector installation, SW walnut st; 1 LS roadside restoration.

Buyer
City of Tigard

City · OR, US

Released
Aug 7, 2026
Closes
Aug 20, 2026(7 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts