CityOK
Jul 26, 2026
Closes
Aug 25, 2026
Billings 2026 CDBG Waterline Replacement
Waterline replacement. Scope of work includes - 15,599 L 8" SDR11 HDPE (DIPS) waterline: 463 LF 8" SDR 11 HDPE (DIPS) waterline (installed via HDD); see attached file.
Description: Work includes approx 1,045 LF of 12" DR-11 HDPE pipe in trench; 13 SY cut and remove existing asphalt; 13 SY asphalt patchback; 9 CY flowfill back fill at roadway crossing.
City · CO, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Town of Mountain Village.
Adjacent opportunities open for bidding right now.
CityOK
Jul 26, 2026
Closes
Aug 25, 2026
Waterline replacement. Scope of work includes - 15,599 L 8" SDR11 HDPE (DIPS) waterline: 463 LF 8" SDR 11 HDPE (DIPS) waterline (installed via HDD); see attached file.
CitySC
Jul 29, 2026
Closes
Aug 19, 2026
Work includes install 1,450-feet of two (2") inch sdr 21 (pvc). Combined total for both locations. See project material list for appurtenances; install applicable gate valves, blow off valves and fittings; replace 19 existing 3/4" services, piping and fittings (include new angle valve, yoke bar and residential dual check per sl&w detail) see 'project material list' for appurtenances; install concrete monuments and donuts on all new gate and blow off valves. Installation shall be in accordance with site s proposed layout (see attachment section. And testing of new installations shall be per sl&w requirements. See attached file.
Rio Lucio Mutual Domestic Water Consumers Assoc.
Special DistrictNM
Aug 2, 2026
Closes
Sep 1, 2026
Project includes the following work: installation of approx 3,140 LF of 4" c900 PVC waterline including gate valves, fire hydrants, and appurtenances; approx 30 new water meter assemblies and other related meter replacement work.
CitySC
Aug 10, 2026
Closes
Sep 10, 2026
Work includes approx 3,500 LF of 8" water main. Work includes connections to existing water mains, installation of new service lines to existing water meters, abandonment of existing water lines and valves, installation of gate valves and fire hydrant assemblies, restrained joint fittings and air release valves, removal and replacement of asphalt roadway, asphalt driveways, and concrete sidewalks, and all other necessary appurtenances