2026/2027 STREET RESURFACING RFP
Asphalt resurfacing of designated Town of Sunset Beach streets, including milling, patching, traffic control, and pavement markings.
Description: Seeking qualified and experienced biddersto respond to a fixed (one-time) project for street resurfacing services and resurfacing of three existing parking lots.
City · GA, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
222 days before RFP
Staff reported a $3 million 2026 paving programme for about 21.8 lane miles and parking lots at Brown Mill Park, Bington Park and Southeast Athletic Complex, with the bid released and scheduled for council approval.
street paving uh this is for 2026 uh this is where you'll hear about uh elm but we've been paying for it out of splass it's a $3 million budget we're expected to pave 21.8 eight lane miles parking lots at Brown Mill Park, Bington Park, the upper left, and Southeast Athletic Complex. And a bid was released in December of 2025, and the bid will open February…
Tips Committee Committee Meeting
Board meeting · Feb 11, 2026
Currently for FY26, there is a $3 million um recommended for street resurfacing. In our transportation projects, we want to make sure that we have uh funding set aside for any unforeseen or emergency projects at $400,000, street lighting at 300,000, sidewalk design 300, sidewalk construction at 900,000, and Hill Veil Bridge Design study at 300,000. We are…
City Council Meeting
Board meeting · Oct 27, 2025
in our capital improvement. um program expenditures. Um some of the things that we are uh looking at, I'll start with the resurfacing, $3 million. Again, sidewalks between design and construction, uh a million dollars. Other infrastructure projects that we um that I'll talk about more in detail uh in a later slide. We have that there. And then in…
City Council Meeting
Board meeting · Nov 24, 2025
Board meeting
194 days before RFP
Staff reported that the 2026 streets-and-parking-lots bid was open, included resurfacing at the Browns Mill upper lot and Southeast Athletic Complex, and had a selected vendor pending council approval.
and then the next one is 2026. It is about $3 million funded for streets and then it is $21.8 $8 million in parking lots of Browns Mill up at the upper lot and in southeast athletic complex resurfacing included in that um with 12:30 we opened on um December sorry February 1720 and then I'm waiting for the financial department to bring it to the council to…
Tips Committee Committee Meeting
Board meeting · Mar 11, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (Closed)
Decision makers connected to this RFP from City of Stonecrest.
These related opportunities are still open for bidding.
CityNC
Posted
-
Nov 12, 2026
Asphalt resurfacing of designated Town of Sunset Beach streets, including milling, patching, traffic control, and pavement markings.
CitySC
Posted
Oct 8, 2026
Jan 8, 2027
Repair and resurfacing of roads. All utility locates are the responsibility of the contractor. Remove any visible tree roots in the project area. Repair any damage to any private property during the project, including but not limited to irrigation and landscaping. Remove and dispose of damaged existing asphalt. Allow for unsuitable undercut as needed. Adequate compaction of aggregate base is required. Proof rolling may be required on the large patches. New asphalt shall be SC Surface Type C. Replace approximately 126 tons of asphalt with 4” depth. Adequate emulsified asphalt shall be applied to all cut asphalt edges before new asphalt is installed.
CityOK
Posted
Oct 28, 2026
Nov 23, 2026
Street resurfacing project along a 0.65-mile stretch of 2nd street. The project will consist of a 2" mill and fill, patchwork, and restriping.
CityAZ
Posted
-
Dec 4, 2026
Work includes pavement resurfacing and schools pedestrian pathway