Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of the removal of (3) existing level 2 electric vehicle chargers (EVC), and the installation of (3) new level 2 dual port pedestal chargers and (5) new level 3 dual port 40kw pedestal chargers, and (4) foundations for future pedestal chargers. It also includes all associated equipment, including but not limited to, above ground electrical conduit, trenching for below ground electrical conduits, site demolition and restoration, including but not limited to existing asphalt, parking lines.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Furnishing all labor, materials, equipment, and services for the construction of improvements designated as: Enhanced Treatment and Site Upgrade (ETSU) Program Phase 2 Fleet EV Charging Project.
Posted Date
Dec 11, 2025
Due Date
Jan 20, 2026
Release: Dec 11, 2025
Close: Jan 20, 2026
Furnishing all labor, materials, equipment, and services for the construction of improvements designated as: Enhanced Treatment and Site Upgrade (ETSU) Program Phase 2 Fleet EV Charging Project.
AvailableThe City of West Chicago seeks bids for the 2026 Industrial Streets Improvement Project – Phase A, which reconstructs Downs Drive and Western Drive. The work includes full‑depth PCC roadway reconstruction, new curb and gutter, new sidewalks, driveway removals and replacements, water main replacement, new street lighting, and related utility structure adjustments. Digital bid documents are available via QuestCDN (Quest Project #9987239), and bids are due January 27, 2026 at 11:00 AM CT.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
The City of West Chicago seeks bids for the 2026 Industrial Streets Improvement Project – Phase A, which reconstructs Downs Drive and Western Drive. The work includes full‑depth PCC roadway reconstruction, new curb and gutter, new sidewalks, driveway removals and replacements, water main replacement, new street lighting, and related utility structure adjustments. Digital bid documents are available via QuestCDN (Quest Project #9987239), and bids are due January 27, 2026 at 11:00 AM CT.
Contra Costa Transportation Authority is soliciting Project and Construction Management services for the I-680 Northbound Express Lane Completion Project (Phase 1). The RFP (No. 25-4) requests a Project and Construction Management Consultant to perform the Scope of Work described in Attachment A and to support the Authority’s first Progressive Design-Build project; the estimated value range is approximately $5,000,000–$15,000,000. Electronic proposals are due Jan 30, 2026 by 5:00 PM PST; a virtual pre-proposal conference is scheduled for Jan 8, 2026 at 1:00 PM PST and the Q&A deadline is Jan 15, 2026 at 4:00 PM PST.
Posted Date
Dec 19, 2025
Due Date
Jan 31, 2026
Provide fleet vehicle and equipment: 2026 (1) Each 6X4 4,000 gallon water truck. 2026 (2) Ea 4X2 dump truck with gallon body. 2026 (1) Ea AWD four (4) quad track sno-cat. 2026 (1) Ea 6X6 motor grader. 2026 (1) Ea 4X4 backhoe loader. 2026 (1) Ea brush chipper. 2026 (2) Ea walk-in hotstick trailer.
Posted Date
Dec 31, 2025
Due Date
Jan 28, 2026
Release: Dec 31, 2025
Close: Jan 28, 2026
Provide fleet vehicle and equipment: 2026 (1) Each 6X4 4,000 gallon water truck. 2026 (2) Ea 4X2 dump truck with gallon body. 2026 (1) Ea AWD four (4) quad track sno-cat. 2026 (1) Ea 6X6 motor grader. 2026 (1) Ea 4X4 backhoe loader. 2026 (1) Ea brush chipper. 2026 (2) Ea walk-in hotstick trailer.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contra Costa Transportation Authority is soliciting Project and Construction Management services for the I-680 Northbound Express Lane Completion Project (Phase 1). The RFP (No. 25-4) requests a Project and Construction Management Consultant to perform the Scope of Work described in Attachment A and to support the Authority’s first Progressive Design-Build project; the estimated value range is approximately $5,000,000–$15,000,000. Electronic proposals are due Jan 30, 2026 by 5:00 PM PST; a virtual pre-proposal conference is scheduled for Jan 8, 2026 at 1:00 PM PST and the Q&A deadline is Jan 15, 2026 at 4:00 PM PST.