Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Alley repair concrete term contract work includes 4 EA removing an existing damaged top for 5' wide inlet to the bottom of the throat paving, and replacing it with a new inlet top of 3,600 PSI reinforced class C concrete; 4 EA removing an existing damaged top for a 10' wide inlet to the bottom of the throat paving, and replacing it with a new inlet top of 3,600 PSI compressive strength concrete; see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
2026 concrete street repair project.
Posted Date
Jan 16, 2026
Due Date
Feb 11, 2026
Release: Jan 16, 2026
Close: Feb 11, 2026
2026 concrete street repair project.
AvailableWork consist of approx. 18,000 SF of 4? & 6? concrete installation, approx. 6,250 SF of ADA sidewalk ramp installation, approx. 6,200' of curb and gutter removal.
Posted Date
Jan 16, 2026
Due Date
Jan 29, 2026
Release: Jan 16, 2026
Close: Jan 29, 2026
Work consist of approx. 18,000 SF of 4? & 6? concrete installation, approx. 6,250 SF of ADA sidewalk ramp installation, approx. 6,200' of curb and gutter removal.
AvailableProcurement of services for the 2026 Alley & Brick Street Reconstruction and Patching project, including Portland Cement Concrete (PCC) alley reconstruction, sewer construction, brick street reconstruction, brick roadway patching, concrete sidewalk replacement, pedestrian bump-out construction, PCC pavement replacement, and alley PCC pavement patching.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
Procurement of services for the 2026 Alley & Brick Street Reconstruction and Patching project, including Portland Cement Concrete (PCC) alley reconstruction, sewer construction, brick street reconstruction, brick roadway patching, concrete sidewalk replacement, pedestrian bump-out construction, PCC pavement replacement, and alley PCC pavement patching.
AvailableThe City of Tupelo, Mississippi Public Works Department is soliciting bids for a term contract covering concrete curb and gutter, flatwork, and minor structures. Bids are due at 10:00 A.M. local time on February 24, 2026, and may be submitted per the instructions in the advertisement for bids. The procurement is a construction/services term bid, not a grant program.
Posted Date
-
Due Date
Feb 24, 2026
Close: Feb 24, 2026
The City of Tupelo, Mississippi Public Works Department is soliciting bids for a term contract covering concrete curb and gutter, flatwork, and minor structures. Bids are due at 10:00 A.M. local time on February 24, 2026, and may be submitted per the instructions in the advertisement for bids. The procurement is a construction/services term bid, not a grant program.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis