Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
McAllen Independent School District is soliciting competitive sealed proposals to upgrade the security surveillance system at James “Nikki” Rowe High School. Proposals are due December 10, 2025 at 2:00 PM CT, with a pre‑proposal conference on December 3, 2025 at 10:00 AM CT.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes security surveillance upgrades.
Posted Date
Nov 21, 2025
Due Date
Dec 17, 2025
Release: Nov 21, 2025
Close: Dec 17, 2025
Work includes security surveillance upgrades.
AvailablePremium
Access the largest public sector contact database
Rehabilitation of the 1934 Zilker Metro Park Clubhouse, including building envelope restoration, lead-based paint and asbestos remediation, upgrades to electrical, plumbing, and HVAC systems, interior reconfigurations, new terrace construction, and site work meeting ADA requirements. Alternate includes masonry and wood structure restoration at Lookout Point.
Posted Date
Oct 1, 2023
Due Date
Jan 26, 2026
Release: Oct 1, 2023
Close: Jan 26, 2026
Rehabilitation of the 1934 Zilker Metro Park Clubhouse, including building envelope restoration, lead-based paint and asbestos remediation, upgrades to electrical, plumbing, and HVAC systems, interior reconfigurations, new terrace construction, and site work meeting ADA requirements. Alternate includes masonry and wood structure restoration at Lookout Point.
AvailableProvide auditorium AV upgrades project.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Provide auditorium AV upgrades project.
AvailablePlano ISD solicits competitive sealed proposals for construction/renovation at Thomas Elementary School (Plano, TX), including HVAC upgrades (select RTU replacements, HVAC controls renovation), replacement of one boiler with two new boilers, fire alarm system replacement, sprinkler valve replacement, marquee replacement, full restroom renovations, and three alternates for chiller/primary/secondary pump work. Estimated construction budget ~$2.4M (plus owner/construction contingencies and allowances). Procurement requires a two-part submission (electronic via Ionwave plus hard-copy sealed proposal), 5% bid bond, required performance/payment bonds and specified insurance, contractor qualification documentation (AIA A305), and other compliance forms; mandatory pre-bid/site visit and virtual proposal opening. Contact: Veronica Couzynse (veronica.couzynse@pisd.edu).
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
Plano ISD solicits competitive sealed proposals for construction/renovation at Thomas Elementary School (Plano, TX), including HVAC upgrades (select RTU replacements, HVAC controls renovation), replacement of one boiler with two new boilers, fire alarm system replacement, sprinkler valve replacement, marquee replacement, full restroom renovations, and three alternates for chiller/primary/secondary pump work. Estimated construction budget ~$2.4M (plus owner/construction contingencies and allowances). Procurement requires a two-part submission (electronic via Ionwave plus hard-copy sealed proposal), 5% bid bond, required performance/payment bonds and specified insurance, contractor qualification documentation (AIA A305), and other compliance forms; mandatory pre-bid/site visit and virtual proposal opening. Contact: Veronica Couzynse (veronica.couzynse@pisd.edu).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis