Closing soon

2026 Pump Station Replacements FOSS 2 and Sabattus RFP

Description: The work for the 2026 pump station replacements foss 2 and sabattus shall consist of, but not be limited to, the complete and satisfactory construction and installation of the following at both the foss 2 and sabattus pump stations: removal of an existing smith & loveless suction pump dry well units set on top of an existing six (6) foot diameter concrete wet well (to remain), install additional six (6) foot diameter precast concrete barrel sections extending the existing wet well up to surface grade, remove existing concrete chamfer at the bottom of the existing wet well, new submersible pumps, ductile iron pipe and fittings, transducer and backup floats, one (1) six (6) foot diameter precast check valve vault, sewer bypass during construction, sewer piping connection to existing force main, electrical transfer switch,

Buyer
City of Lewiston

City · ME, US

Released
Aug 12, 2026
Closes
Oct 27, 2026(8 days left)

RFP documents

Solicitation files and supporting documents for this bid.

  • 2026 Pump Station Replacements FOSS 2 and SabattusZIP
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts