CityWI
Aug 5, 2026
Closes
Aug 27, 2026
2026-02 Utility Extensions, CTH KW - Lake Drive RFP
Project consists of water main extensions throughout the project limits. Major work items and approximate quantities include: 11,190 LF of PVC watermain directionally bored, 660 LF of HDPE water services, directionally bored; 180 LF of culvert pipe replacement, 275 TN of asphalt surface patching, 20 EA hydrants, 1 LS pressure reducing vault with electrical controls, 2 LS flushing hydrant, 1 LS installation of electrical controls on