Tahoe City Public Utility Dist
Special DistrictCA
Posted
Sep 5, 2026
Sep 30, 2026
Lake Forest Boat Ramp Maintenance Dredging Project
Work includes dredge approx. 400 SY from the boat ramp fairway and associated items.
Description: This Project consists of sidewalks, wall construction, light earthwork, and all work included in the Picnic Area.
City · GA, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
Tahoe City Public Utility Dist
Special DistrictCA
Posted
Sep 5, 2026
Sep 30, 2026
Work includes dredge approx. 400 SY from the boat ramp fairway and associated items.
CityFL
Posted
Sep 5, 2026
Oct 6, 2026
Project consists of removal and replacement of the damaged cast-in-place concrete ramp section, resetting existing precast concrete ramp pads with new stone bedding, installing expansion joints, and constructing riprap revetment with filter fabric for erosion protection. Existing docks, finger piers, and remaining portions of the boat ramp are to be protected and maintained.
CityFL
Posted
-
Sep 17, 2026
Install new bulkhead and floating dock, remove and replace new concrete sidewalk, mill and resurface asphalt parking lot, remove and construct new concrete boat ramp, install groundcover and landscaping, provide pavement markings, drainage construction, and irrigation, and perform all other related work as specified in the contract documents.
CountyFL
Posted
-
Sep 23, 2026
Work inlcudes 300 LF sediment barrier (silt fence); 170 LF floating turbidity barrier (including floats, anchors, maintenance, relocation, and removal); 139 CY channel excavation; 42 CY embankment; 145 SY type b stabilization (lbr 40); 98 SY optional base, base group 06; 25 TN superpave asphaltic concrete, traffic c, pg 76-22; 145 LF concrete curb, type d; 21 SY concrete sidewalk, 6' thick (fdot index 522-001). See outside link.
Decision makers connected to this RFP from City of Dahlonega.