George Washington Regional Commission
Seeking experienced contractors to repair an existing failed septic system including replacement of distribution box, install three new trenches and all work.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
West Virginia Department of Transportation
HAU Septic System- Largent Substation.
Posted Date
Nov 5, 2025
Due Date
Dec 2, 2025
Release: Nov 5, 2025
West Virginia Department of Transportation
Close: Dec 2, 2025
HAU Septic System- Largent Substation.
AvailableCowlitz County
Install a replacement large onsite septic system (LOSS) including a new tank, drainfield, and distribution system in the Camelot development includes 1,215 LF removing wire fence, 890 LF roadway excavation - new access road and stockpile relocation, 3,675 LF testing pipe (delivery piping), 90 LF 8" PVC 3034 sanitary sewer pipe, 10" PVC 3024 temporary bypass system, LOSS drainfield piping (complete), LOSS pumps delivery system, LOSS controls system, LOSS electrical installation, abandon existing drainfield.
Posted Date
Oct 24, 2025
Due Date
Nov 24, 2025
Release: Oct 24, 2025
Cowlitz County
Close: Nov 24, 2025
Install a replacement large onsite septic system (LOSS) including a new tank, drainfield, and distribution system in the Camelot development includes 1,215 LF removing wire fence, 890 LF roadway excavation - new access road and stockpile relocation, 3,675 LF testing pipe (delivery piping), 90 LF 8" PVC 3034 sanitary sewer pipe, 10" PVC 3024 temporary bypass system, LOSS drainfield piping (complete), LOSS pumps delivery system, LOSS controls system, LOSS electrical installation, abandon existing drainfield.
AvailableTown of Harpswell
Replacement of a septic system.
Posted Date
Oct 24, 2025
Due Date
Nov 18, 2025
Release: Oct 24, 2025
Town of Harpswell
Close: Nov 18, 2025
Replacement of a septic system.
Gloucester County
Seeking engineer with experience in septic/well systems to conduct septic/well system plan reviews.
Posted Date
Nov 12, 2025
Due Date
Dec 11, 2025
Release: Nov 12, 2025
Gloucester County
Close: Dec 11, 2025
Seeking engineer with experience in septic/well systems to conduct septic/well system plan reviews.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis