Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of work includes the installation 462 LF 8” C-900 water line including 2 new services and appurtenances, 2 ea. hydrant assemblie, 744 LF 8” 3034 PVC gravity sewer, 4 ea. 48” standard manholes, 1 ea. 6” sanitary sewer lateral, 10 ea. 4” sanitary sewer lateral.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work including. 1,918 LF of 10” SDR 35 PVC sewer line with associated appurtenances. 102 LF 14" steel encasement, 100 LF 14" bore, 90 LF 8'-10' trenching, 3 EA 6' Dia. new manhole, 4 EA cap and abandon existing sewer line, 0.71 AC clearing & grubbing, 5 LF curb and gutter repair, 69 LF asphalt pavement repair, 42 LF fence repair, 35 LF 24" RCP storm sewer pipe, 1,850 LF 8" grout existing sewer line.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
Work including. 1,918 LF of 10” SDR 35 PVC sewer line with associated appurtenances. 102 LF 14" steel encasement, 100 LF 14" bore, 90 LF 8'-10' trenching, 3 EA 6' Dia. new manhole, 4 EA cap and abandon existing sewer line, 0.71 AC clearing & grubbing, 5 LF curb and gutter repair, 69 LF asphalt pavement repair, 42 LF fence repair, 35 LF 24" RCP storm sewer pipe, 1,850 LF 8" grout existing sewer line.
AvailableProvide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailableSewer, Domestic Water, Recycled Water and Storm Drain Improvements.
Posted Date
Nov 11, 2025
Due Date
Jan 8, 2026
Release: Nov 11, 2025
Close: Jan 8, 2026
Sewer, Domestic Water, Recycled Water and Storm Drain Improvements.
AvailableInstallation of 906 feet of water line including valves, fire hydrants, services, and other appurtenances. Installation of 814 feet of sewer including manholes, services, and other appurtenances. Installation of 2,070 SY of asphalt street.
Posted Date
-
Due Date
Jan 6, 2026
Release: -
Close: Jan 6, 2026
Installation of 906 feet of water line including valves, fire hydrants, services, and other appurtenances. Installation of 814 feet of sewer including manholes, services, and other appurtenances. Installation of 2,070 SY of asphalt street.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis