Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sewer, Domestic Water, Recycled Water and Storm Drain Improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
work includes the construction of a grassed waterway, storm sewer connections, and miscellaneous drainage improvements for the Ringgenberg Farm.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
work includes the construction of a grassed waterway, storm sewer connections, and miscellaneous drainage improvements for the Ringgenberg Farm.
AvailablePremium
Access the largest public sector contact database
The solicitation seeks contractors to construct a grassed waterway, install storm sewer connections, and complete miscellaneous drainage improvements at Ringgenberg Farm to improve storm water management. Proposals are due by Dec 16, 2025 and contractors should obtain solicitation documents from the buyer's site (BidExpress) before submitting.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
The solicitation seeks contractors to construct a grassed waterway, install storm sewer connections, and complete miscellaneous drainage improvements at Ringgenberg Farm to improve storm water management. Proposals are due by Dec 16, 2025 and contractors should obtain solicitation documents from the buyer's site (BidExpress) before submitting.
AvailableIn general, the work consists of: removing the existing sidewalk and retaining wall, constructing a new concrete retaining wall, replacing the sidewalk, installing a storm inlet and trench drain, and regrading the disturbed area and restoration of disturbed area on the west side of Fricker Hall.
Posted Date
Nov 11, 2025
Due Date
Dec 17, 2025
Release: Nov 11, 2025
Close: Dec 17, 2025
In general, the work consists of: removing the existing sidewalk and retaining wall, constructing a new concrete retaining wall, replacing the sidewalk, installing a storm inlet and trench drain, and regrading the disturbed area and restoration of disturbed area on the west side of Fricker Hall.
AvailableReconstruction of street. Storm sewer installation and construction of a stormwater detention basin. The reconstruction of street will include installation of sidewalk, curb, storm sewer, water line relocation, and sanitary sewer relocation.
Posted Date
Dec 1, 2025
Due Date
Dec 22, 2025
Release: Dec 1, 2025
Close: Dec 22, 2025
Reconstruction of street. Storm sewer installation and construction of a stormwater detention basin. The reconstruction of street will include installation of sidewalk, curb, storm sewer, water line relocation, and sanitary sewer relocation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis