Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide roofing improvements includes install retrofit metal framing system over the existing metal roof; install required perimeter wood blocking as needed; install new 2" of polyisocyanurate insulation or an equivalent r-value of batt insulation. Fastening pattern shall be sufficient to secure insulation during construction; install 16 ga. Concealed one-piece clips in strict accordance with wind-uplift engineering guidelines; install new 16" 22 ga. Pre-finished galvanized panels; replace all associated sheet metal, flashings, trim, coping, etc. With prefinished metal. Gutters and downspouts to be pre-finished galvanized; new eave, rake, and hip flashings will be installed to provide a complete watertight roof assembly; all plumbing stacks will be raised as needed to provide a 12" flashing height.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes roofing improvements includes remove and replace a 4' x 8' (32 SF) area of existing insulation with new polyisocyanurate insulation, 2" thick; remove and replace existing roof drain head/clamping ring and stainer; see outside link.
Posted Date
Dec 8, 2025
Due Date
Dec 23, 2025
Release: Dec 8, 2025
Close: Dec 23, 2025
Work includes roofing improvements includes remove and replace a 4' x 8' (32 SF) area of existing insulation with new polyisocyanurate insulation, 2" thick; remove and replace existing roof drain head/clamping ring and stainer; see outside link.
AvailableMechanical, Electrical, Roofing Improvements At Elementary School.
Posted Date
Nov 15, 2025
Due Date
Dec 16, 2025
Release: Nov 15, 2025
Close: Dec 16, 2025
Mechanical, Electrical, Roofing Improvements At Elementary School.
AvailableFor 2025 road way improvements.
Posted Date
-
Due Date
Dec 22, 2025
Release: -
Close: Dec 22, 2025
For 2025 road way improvements.
Available2025 park fencing improvements to complete repairs and new installation of fencing.
Posted Date
Dec 2, 2025
Due Date
Dec 18, 2025
Release: Dec 2, 2025
Close: Dec 18, 2025
2025 park fencing improvements to complete repairs and new installation of fencing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis