Closing soon2025 December Adverse Weather Emergency Road Repairs: Cedar Street and Bandicoot Trail
Description: Project consist of repair and replace asphalt and concrete pavement and/or cross gutters, storm drain and headwall, manholes, valve-covers, signage and striping, and fencing that was damaged from the storm event at the intersection of cedar street and bandicoot trail to pre-storm conditions. The work consists of earthwork, placement of material as required, removal and proper disposal of damaged asphalt pavement and other deleterious materials, restoration of roadway and shoulder grade, furnishing new asphalt and concrete pavement, removal and replacement of affected striping and markings, removal and replacement of damaged storm drain, and all appurtenant work related to a project of this type.