Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide for a general contractor who shall provide all labor, materials, tools and equipment necessary to perform in a professional manner for the 2025 cold milling of city streets.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work include 15 EA erosion control, inlet protection, fabric drop; 260,260 SY cold milling hma surface; 150 SY bump grinding; 75' pavt mrkg, ovly cold plastic, 12", cross hatching, yellow; 116' pavt mrkg, ovly cold plastic, 24", stop bar; 122,930' pavt mrkg, waterborne, 6", white; 82,700' pavt mrkg, waterborne, 2nd application, 6", yellow; 809 SF sign, type b, temp, prismatic, furn; 11,000' pavt mrkg, wet reflective, type r, tape, 6", yellow, temp; 12 EA rumble strip, temp, portable, furn; 59,099' centerline corrugations, milled, hma.
Posted Date
Dec 11, 2025
Due Date
Jan 9, 2026
Premium
Access the largest public sector contact database
Work include 15 EA erosion control, inlet protection, fabric drop; 260,260 SY cold milling hma surface; 150 SY bump grinding; 75' pavt mrkg, ovly cold plastic, 12", cross hatching, yellow; 116' pavt mrkg, ovly cold plastic, 24", stop bar; 122,930' pavt mrkg, waterborne, 6", white; 82,700' pavt mrkg, waterborne, 2nd application, 6", yellow; 809 SF sign, type b, temp, prismatic, furn; 11,000' pavt mrkg, wet reflective, type r, tape, 6", yellow, temp; 12 EA rumble strip, temp, portable, furn; 59,099' centerline corrugations, milled, hma.
Available4.17 mi northbound and 4.23 mi southbound of one course hot mix asphalt cold milling and resurfacing, shoulder corrugations and pavement markings.
Posted Date
Nov 14, 2025
Due Date
Jan 9, 2026
Release: Nov 14, 2025
Close: Jan 9, 2026
4.17 mi northbound and 4.23 mi southbound of one course hot mix asphalt cold milling and resurfacing, shoulder corrugations and pavement markings.
AvailableWork includes 66 EA. Guardrail reflectors, type C (special); 174,503 SY hot-mix asphalt surface removal, variable depth; 174,503 SY cold in-place recycling, 4.0"; 1,289 ton CIR full depth reclamation emulsified asphalt; 30' grooving for recessed pavement marking 25"; 114' grooving for recessed pavement marking 13"; 153,845' modified urethane pavement marking - line 4"; 33.9 SF relocate sign panel - type 2; 64.5 SF relocate sign panel - type 1; 331.9 SF sign panel - type 1; 151 SF sign panel - type 2; 30 cal. Da changeable message sign; 30,205' short term pavement marking.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Work includes 66 EA. Guardrail reflectors, type C (special); 174,503 SY hot-mix asphalt surface removal, variable depth; 174,503 SY cold in-place recycling, 4.0"; 1,289 ton CIR full depth reclamation emulsified asphalt; 30' grooving for recessed pavement marking 25"; 114' grooving for recessed pavement marking 13"; 153,845' modified urethane pavement marking - line 4"; 33.9 SF relocate sign panel - type 2; 64.5 SF relocate sign panel - type 1; 331.9 SF sign panel - type 1; 151 SF sign panel - type 2; 30 cal. Da changeable message sign; 30,205' short term pavement marking.
Available4.21 mi of concrete reconstruction, drainage, guardrail, signing, hot mix asphalt cold milling and resurfacing, culvert replacement and pavement markings and bridge rehabilitation of 5 structures including epoxy overlay, substructure patching, joint repairs, silane treatment, concrete surface coating, deck patching, full depth deck patching, riprap replacement, substructure repairs and approach work.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Close: Dec 19, 2025
4.21 mi of concrete reconstruction, drainage, guardrail, signing, hot mix asphalt cold milling and resurfacing, culvert replacement and pavement markings and bridge rehabilitation of 5 structures including epoxy overlay, substructure patching, joint repairs, silane treatment, concrete surface coating, deck patching, full depth deck patching, riprap replacement, substructure repairs and approach work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis