Aug 13, 2026
Closes
Aug 27, 2026
Well No. 3 Maintenance and Repair Project RFP
Well no. 3 maintenance and repair work.
Description: The project consists of the rehabilitate the existing 285,000-gallon welded—steeI ground storage by replacing the roof with a new seal- welded steel roof with center support, installing required safety and access appurtenances, removing accumulated sediment, and fully recoating the interior and exterior tank surfaces
City · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Aug 13, 2026
Closes
Aug 27, 2026
Well no. 3 maintenance and repair work.
CityIL
Aug 4, 2026
Closes
Aug 18, 2026
Work generally consists of the decommissioning and closure of Well #5, including well abandonment in accordance with Illinois Department of Public Health (IDPH) requirements, removal of the existing submersible pump and associated appurtenances, pressure grouting of the well, site restoration, and all incidental work, as detailed in the plans and specifications titled "Village of Bellwood, Well #5 Decommissioning and Closure Project."
Oglala Sioux Parks & Recreation Authority
Special DistrictSD
Aug 5, 2026
Closes
Sep 4, 2026
Drilling and installation of an electric water well system. Estimated well depth of approximately 400 feet; Electrical wiring, pump cable, and connections;
CityCA
Aug 11, 2026
Closes
Sep 8, 2026
Construction of Well 15 and 21 Blending Facility Project, including new outdoor well pump infrastructure, piping, site grading, and SCADA integration.
Procurement and program contacts connected to City of Clifton.