Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of approx 193 LF of sanitary sewer installation include, grading, excavation, subgrade preparation and modified subbase, sanitary sewer, structures, and services; water main adjustment; 5" P.C. Concrete sidewalk; 7" P.C. Concrete pavement; granular surfacing, pavement removals, removal and reinstallation of play equipment, surfacing, and fence, temporary traffic control, erosion control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project consists of the installation of a sanitary sewer extension along a portion of south main street.
Posted Date
Jan 6, 2026
Due Date
Jan 23, 2026
Release: Jan 6, 2026
Close: Jan 23, 2026
This project consists of the installation of a sanitary sewer extension along a portion of south main street.
AvailableWork includes 1 LS color audio/video recording pre and post construction (dvd); 2,100 LF cctv inspection (pre construction); 2,772 lf cctv inspection (post construction); 1 LS bypass pumping; 1 ls dewatering; 1 ls deflection test (<24"); 10 EA cipp patch/point repair (8" diameter sewer); 1 EA cipp patch/point repair (12" diameter sewer); 939 LF trench excavation and backfill 0-10'; 1,557 lf trench excavation and backfill 0-15'; 152 LF trench excavation and backfill 0-20'; 91 LF 8" sewer pipe (pvc - sdr-35); 1,262 LF 8" sewer pipe (pvc - sdr-26); 843 LF 12" sewer pipe (pvc - sdr-35); 452 LF 12" sewer pipe (pvc - sdr-26). See attached file.
Posted Date
Dec 20, 2025
Due Date
Jan 20, 2026
Release: Dec 20, 2025
Close: Jan 20, 2026
Work includes 1 LS color audio/video recording pre and post construction (dvd); 2,100 LF cctv inspection (pre construction); 2,772 lf cctv inspection (post construction); 1 LS bypass pumping; 1 ls dewatering; 1 ls deflection test (<24"); 10 EA cipp patch/point repair (8" diameter sewer); 1 EA cipp patch/point repair (12" diameter sewer); 939 LF trench excavation and backfill 0-10'; 1,557 lf trench excavation and backfill 0-15'; 152 LF trench excavation and backfill 0-20'; 91 LF 8" sewer pipe (pvc - sdr-35); 1,262 LF 8" sewer pipe (pvc - sdr-26); 843 LF 12" sewer pipe (pvc - sdr-35); 452 LF 12" sewer pipe (pvc - sdr-26). See attached file.
The project is described as the construction of a 18" sanitary sewer replacing the existing 12" sanitary sewer. This project consists of approx 2,500 LF of new 18" sanitary sewer main. The existing 12” sanitary sewer will be abandoned or removed to facilitate the construction of the new sanitary sewer interceptor. Tree removal, pavement patching, multi use path replacement, bypass pumping and sidewalk replacement will be completed as necessary
Posted Date
Dec 17, 2026
Due Date
Jan 13, 2026
Release: Dec 17, 2026
Close: Jan 13, 2026
The project is described as the construction of a 18" sanitary sewer replacing the existing 12" sanitary sewer. This project consists of approx 2,500 LF of new 18" sanitary sewer main. The existing 12” sanitary sewer will be abandoned or removed to facilitate the construction of the new sanitary sewer interceptor. Tree removal, pavement patching, multi use path replacement, bypass pumping and sidewalk replacement will be completed as necessary
Seeking contractors to replace 710 LF of sanitary sewer via boring, reconnect all service lines to proposed pipe and rehabilitate pavement area around bore pits. This sanitary pipe replacement project will help improve sewage conveyance in the city. Installation of new sanitary sewer in the city including the abandonment of existing sanitary sewer in place. The project includes installing approx 710 LF of sanitary sewer pipe, including reconnection of all existing services lines. It requires the abandonment of the broken esxisting saniarty sewer line that is being replaced and lastly the restoration of all disturbed areas to their original or improved condition.
Posted Date
Dec 28, 2025
Due Date
Jan 21, 2026
Release: Dec 28, 2025
Close: Jan 21, 2026
Seeking contractors to replace 710 LF of sanitary sewer via boring, reconnect all service lines to proposed pipe and rehabilitate pavement area around bore pits. This sanitary pipe replacement project will help improve sewage conveyance in the city. Installation of new sanitary sewer in the city including the abandonment of existing sanitary sewer in place. The project includes installing approx 710 LF of sanitary sewer pipe, including reconnection of all existing services lines. It requires the abandonment of the broken esxisting saniarty sewer line that is being replaced and lastly the restoration of all disturbed areas to their original or improved condition.