Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Rancho Cordova is soliciting competitive bids for the 2025 ADA Sidewalk Project to construct and upgrade sidewalks to meet ADA standards, including demolition, installation of ADA-compliant sidewalks, and associated concrete work. The estimated construction cost is $580,000 and contractors must hold a General Engineering (Class A) or C-8 Concrete license. Bids are due before 10:00 AM Pacific on February 4, 2026 and questions are due by January 21, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of approximately 4,000 square feet of P.C.C. sidewalk and trail improvements, including ADA ramps, excavation, and surface restoration, across three distinct locations.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
Construction of approximately 4,000 square feet of P.C.C. sidewalk and trail improvements, including ADA ramps, excavation, and surface restoration, across three distinct locations.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes approximately 395 SY of concrete sidewalk, including two (2) ADA ramps.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
The project includes approximately 395 SY of concrete sidewalk, including two (2) ADA ramps.
AvailableReconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
Posted Date
Nov 7, 2025
Due Date
Jan 30, 2026
Release: Nov 7, 2025
Close: Jan 30, 2026
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
AvailableMedian construction and ADA sidewalk ramp construction.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Median construction and ADA sidewalk ramp construction.