Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2025/2026 Asphalt Patching Program.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Municipality of West Nipissing is seeking qualified contractors to supply labour, material, and equipment for asphalt repair of road cuts at various locations.
Posted Date
-
Due Date
Jan 29, 2026
Release: -
Close: Jan 29, 2026
The Municipality of West Nipissing is seeking qualified contractors to supply labour, material, and equipment for asphalt repair of road cuts at various locations.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal of Concrete Patches: The contractor shall remove existing concrete patches covering City utilities, as identified in the project drawings. Asphalt Milling and Paving: After patch removal, the contractor will mill a 2" depth for a length of 10 FT around the specified area to provide a smooth and level transition to the existing roadway. This milling process shall follow the specifications for pavement preparation outlined in the Contract Documents. Hot Mix Asphalt (HMA) Placement: The contractor will replace the removed concrete patches with a HMA overlay, ensuring that the final surface is level with the surrounding roadway, with no elevation discrepancies.
Posted Date
Dec 18, 2025
Due Date
Jan 13, 2026
Release: Dec 18, 2025
Close: Jan 13, 2026
Removal of Concrete Patches: The contractor shall remove existing concrete patches covering City utilities, as identified in the project drawings. Asphalt Milling and Paving: After patch removal, the contractor will mill a 2" depth for a length of 10 FT around the specified area to provide a smooth and level transition to the existing roadway. This milling process shall follow the specifications for pavement preparation outlined in the Contract Documents. Hot Mix Asphalt (HMA) Placement: The contractor will replace the removed concrete patches with a HMA overlay, ensuring that the final surface is level with the surrounding roadway, with no elevation discrepancies.
AvailableThe Village of Hinsdale is soliciting sealed bids for its 2026 Asphalt Resurfacing Program, covering approximately 1.1 miles of streets and associated curb, sidewalk, driveway, and restoration work. Bidders must be IDOT prequalified and obtain bidding documents via QuestCDN using Project #9903613. Bids are due and will be opened at Village Hall on January 19, 2026 at 10:00 AM CT.
Posted Date
-
Due Date
Jan 19, 2026
Release: -
Close: Jan 19, 2026
The Village of Hinsdale is soliciting sealed bids for its 2026 Asphalt Resurfacing Program, covering approximately 1.1 miles of streets and associated curb, sidewalk, driveway, and restoration work. Bidders must be IDOT prequalified and obtain bidding documents via QuestCDN using Project #9903613. Bids are due and will be opened at Village Hall on January 19, 2026 at 10:00 AM CT.
AvailableRemoval and replacement of existing concrete including concrete pavement, crosspan, sidewalk, curb and gutter, curb ramps, various depths of asphalt patching, milling of existing asphalt pavement, and asphalt paving within the streets.
Posted Date
Nov 21, 2025
Due Date
Jan 13, 2026
Release: Nov 21, 2025
Close: Jan 13, 2026
Removal and replacement of existing concrete including concrete pavement, crosspan, sidewalk, curb and gutter, curb ramps, various depths of asphalt patching, milling of existing asphalt pavement, and asphalt paving within the streets.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →