Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The State of Colorado is soliciting bids to upgrade the food storage cooler at Building 55 of the Colorado Mental Health Institute in Pueblo, converting the existing walk-in cooler to a freezer and the existing freezer to a cooler, and installing associated HVAC, refrigeration, and electrical systems. The work includes installing a new packaged condensing unit with refrigerant piping, providing a 4-inch concrete pad to mount the unit, replacing insulated sliding doors/tracks, and coordinating with kitchen equipment and other trades to minimize disruptions. The procurement is issued as an Invitation for Bid (construction) with a budget estimate of approximately $500,000–$2,000,000.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes convert the existing walk-in-freezer into a walk-in-cooler, removal and replacement of the existing insulated wall & ceiling systems, removal and replacement of existing condensing units/ evaporator units and replacement of the existing insulated sliding doors.
Posted Date
Nov 18, 2025
Due Date
Feb 11, 2026
Release: Nov 18, 2025
Close: Feb 11, 2026
Work includes convert the existing walk-in-freezer into a walk-in-cooler, removal and replacement of the existing insulated wall & ceiling systems, removal and replacement of existing condensing units/ evaporator units and replacement of the existing insulated sliding doors.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of but is not limited to: replacing the existing dry cooler system on the roof to include the dry cooler, pump package, expansion tank, and piping. A new dry cooler, pump package, expansion tank, valves, and piping will be installed. New insulation with jacketing will be included. Electrical work includes demolition of existing power distribution to old equipment and installing new power to equipment. Dry cooler control wiring removal and replacement shall be included.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
The project consists of but is not limited to: replacing the existing dry cooler system on the roof to include the dry cooler, pump package, expansion tank, and piping. A new dry cooler, pump package, expansion tank, valves, and piping will be installed. New insulation with jacketing will be included. Electrical work includes demolition of existing power distribution to old equipment and installing new power to equipment. Dry cooler control wiring removal and replacement shall be included.
AvailableProvide architectural finishes and components related to the renovation for the existing px building on the boone campus. The goal is to renovate the exiting building to become a grab and go hot and cold food service space that provides convenient spot for personnel to order food and beverages and have a "clerk less" point of sale kiosk for payment. Architect to specify: floor finishes, ceiling finishes, new door thresholds, paint for walls, new entry door, new finishes for existing restroom.
Posted Date
Dec 16, 2025
Due Date
Jan 30, 2026
Release: Dec 16, 2025
Close: Jan 30, 2026
Provide architectural finishes and components related to the renovation for the existing px building on the boone campus. The goal is to renovate the exiting building to become a grab and go hot and cold food service space that provides convenient spot for personnel to order food and beverages and have a "clerk less" point of sale kiosk for payment. Architect to specify: floor finishes, ceiling finishes, new door thresholds, paint for walls, new entry door, new finishes for existing restroom.
AvailableProcurement of Walk-In Cooler, Walk-In Freezer, and Refrigeration Systems for the Fond du Lac Food Hall.
Posted Date
Jan 5, 2026
Due Date
Jan 30, 2026
Release: Jan 5, 2026
Close: Jan 30, 2026
Procurement of Walk-In Cooler, Walk-In Freezer, and Refrigeration Systems for the Fond du Lac Food Hall.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →