Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Fond du Lac
The City of Fond du Lac, Wisconsin is soliciting sealed bids from general contractors (RFB 2026-068) for the Police Department Remodel Phase 7.75 project, with the scope of work consisting of renovations and construction of the north atriums at the City/County Government Center police facility. A mandatory pre-bid walkthrough is scheduled for Wednesday, July 1, 2026 at 8:00 A.M. CST, and bids must be received at the City Administrative Office by 2:00 P.M. CST on Wednesday, July 15, 2026 to be publicly opened and read aloud. Each bid must be accompanied by a certified check, bank draft, or bid bond equal to 5% of the gross bid, and complete digital bidding documents are available only through DemandStar.
Posted Date
Jun 18, 2026
Due Date
Jul 15, 2026
Release: Jun 18, 2026
City of Fond du Lac
Close: Jul 15, 2026
The City of Fond du Lac, Wisconsin is soliciting sealed bids from general contractors (RFB 2026-068) for the Police Department Remodel Phase 7.75 project, with the scope of work consisting of renovations and construction of the north atriums at the City/County Government Center police facility. A mandatory pre-bid walkthrough is scheduled for Wednesday, July 1, 2026 at 8:00 A.M. CST, and bids must be received at the City Administrative Office by 2:00 P.M. CST on Wednesday, July 15, 2026 to be publicly opened and read aloud. Each bid must be accompanied by a certified check, bank draft, or bid bond equal to 5% of the gross bid, and complete digital bidding documents are available only through DemandStar.
AvailableCity of Fond du Lac
Provide preventive maintenance, inspection, and testing services for medium-voltage (mv)and low-voltage (lv) electrical equipment, including metal-clad switchgear, switchboards, protective relays, power circuit breakers, instrument transformers, and related components.
Posted Date
Jun 1, 2026
Due Date
Jun 25, 2026
Release: Jun 1, 2026
City of Fond du Lac
Close: Jun 25, 2026
Provide preventive maintenance, inspection, and testing services for medium-voltage (mv)and low-voltage (lv) electrical equipment, including metal-clad switchgear, switchboards, protective relays, power circuit breakers, instrument transformers, and related components.
AvailableCity of Fond du Lac
Project includes 1,400 LF 10" Sanitary Sewer Main; 2,000 LF 8" to 10" Water Main; 150 LF Concrete Curb & Gutter; 200 SF Concrete Sidewalk; 550 SY Mill & Overlay; 520 SY Aggregate Base Course; 520 SY Asphalt Pavement; 2,180 SY Lawn Restoration.
Posted Date
Jun 3, 2026
Due Date
Jun 25, 2026
Release: Jun 3, 2026
City of Fond du Lac
Close: Jun 25, 2026
Project includes 1,400 LF 10" Sanitary Sewer Main; 2,000 LF 8" to 10" Water Main; 150 LF Concrete Curb & Gutter; 200 SF Concrete Sidewalk; 550 SY Mill & Overlay; 520 SY Aggregate Base Course; 520 SY Asphalt Pavement; 2,180 SY Lawn Restoration.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize—no evidence of sole source awards; the city relies on competitive bidding. Note: a $25,000 formal bid threshold channels purchases into competitive bids.
Coops: Buyer hasn’t historically used coops/resellers, but you can encourage them to explore State of Wisconsin statewide contracts via VendorNet, Wisconsin DOA Cooperative Purchasing, Sourcewell, or OMNIA Partners as future options.
Sole Source
Entity: City of Fond du Lac, WI
Board meetings and strategic plans from City of Fond du Lac
The City of Fond du Lac's Comprehensive Plan for 2010-2030 serves as a roadmap to guide its future development and growth. It focuses on land use, implementation strategies, addressing issues and opportunities, and managing natural and cultural resources. Key priorities include developing efficient transportation, providing diverse housing options, maintaining utilities and community facilities, fostering economic development, and promoting intergovernmental cooperation. The plan aims to create a healthy, safe, sustainable, and thriving community with an enhanced quality of life for its residents.
This document, part of the City of Fond du Lac's 2040 Comprehensive Plan Update, presents various maps illustrating key planning elements. These include planning jurisdiction, development limitations, community facilities (parks, schools), economic development zones, existing transportation networks and infrastructure, and current and future land use patterns. The document serves as a visual guide for the city's strategic development towards 2040.
The 2040 Comprehensive Plan for the City of Fond du Lac serves as a roadmap to establish a shared vision and guide future actions and decisions for managing growth. It addresses key elements including Agricultural, Natural & Cultural Resources, Utilities & Community Facilities, Intergovernmental Cooperation, Economic Development, Housing, Transportation, and Land Use. The overarching vision is to foster balanced and sustainable growth, safe and healthy neighborhoods, and provide opportunities for all residents to pursue their dreams and live full lives.
This document outlines a proposed amendment to the City of Fond du Lac's Comprehensive Plan, subject to a public hearing. The amendment's primary purpose is to change the future land use designation of specific parcels from residential to industrial to permit future industrial/manufacturing expansion. The Comprehensive Plan serves as a roadmap for the city's growth and future development.
This document compiles community mapping results and public input, serving as foundational data for the Fond du Lac 2040 Comprehensive Plan. Key areas of public feedback include Bicycle Improvement, Community Asset identification, Park and Landscaping Improvement, Pedestrian Improvement, Preservation of Use, Buildings, and Natural Areas, Redevelopment Opportunities, Road Improvement, and Traffic and Speed Concerns. This input aims to guide strategic development and planning for the city's future through 2040.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Fond du Lac's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge