Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2024 Roadway Paving Projects.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide Rolling Rfp of Capital Improvement Projects.
Posted Date
Sep 22, 2025
Due Date
Jan 18, 2026
Release: Sep 22, 2025
Close: Jan 18, 2026
Provide Rolling Rfp of Capital Improvement Projects.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking qualified asphalt paving companies, acting singularly or in consortium, for road paving projects in the town. All existing pavements will be reclaimed to a minimum depth of eight inches (8") followed by regrading of the roadbed to attain a crown of two and a half percent (2. 5%) or a quarter inch (0. 25") per foot. Prior to beginning reclaiming, excess shoulder materials will be removed where at, or higher than, existing pavements to accommodate grading work and the addition of loam upon completion of paving. Roadbeds will then be watered and compacted to ninety-five percent (95%) compaction, which the town may opt to test prior to paving. All shoulders should then again be cleaned of excess material to allow for placement of four inches (4") of screened loam. See outside link.
Posted Date
Dec 5, 2025
Due Date
Jan 9, 2026
Release: Dec 5, 2025
Close: Jan 9, 2026
Seeking qualified asphalt paving companies, acting singularly or in consortium, for road paving projects in the town. All existing pavements will be reclaimed to a minimum depth of eight inches (8") followed by regrading of the roadbed to attain a crown of two and a half percent (2. 5%) or a quarter inch (0. 25") per foot. Prior to beginning reclaiming, excess shoulder materials will be removed where at, or higher than, existing pavements to accommodate grading work and the addition of loam upon completion of paving. Roadbeds will then be watered and compacted to ninety-five percent (95%) compaction, which the town may opt to test prior to paving. All shoulders should then again be cleaned of excess material to allow for placement of four inches (4") of screened loam. See outside link.
AvailableProposing to combine multiple paving projects into one complete project. The projects consist of 4 roads requiring a complete Pulverization and 3" thick pavement installation as well as 1 road requiring an full width 3" surface mill and 3" overlay. The Pulverization and pave projects will consist of the complete pulverization of existing pavement while mixing recycled asphalt into the subgrade to create a solid road base. The pavement installation would consist of¾" asphalt. The full width surface mill and overlay projects will consist of a full width 3" mill of the existing roadway. See outside link.
Posted Date
Dec 29, 2025
Due Date
Jan 29, 2026
Release: Dec 29, 2025
Close: Jan 29, 2026
Proposing to combine multiple paving projects into one complete project. The projects consist of 4 roads requiring a complete Pulverization and 3" thick pavement installation as well as 1 road requiring an full width 3" surface mill and 3" overlay. The Pulverization and pave projects will consist of the complete pulverization of existing pavement while mixing recycled asphalt into the subgrade to create a solid road base. The pavement installation would consist of¾" asphalt. The full width surface mill and overlay projects will consist of a full width 3" mill of the existing roadway. See outside link.
AvailableRelease: Dec 2, 2025
Close: Jan 7, 2026
Roadway and Drainage Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →